My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06827
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06827
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:05 PM
Creation date
10/5/2006 2:32:25 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Sterling
Basin
South Platte
Title
Pawnee Creek Overflow Interceptor Channel
Date
10/1/2001
Prepared For
Sterling
Prepared By
ICON Engineering, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4. ENCROACHMENT INFORMATION <br /> <br /> <br />Does the State have jurisdiction over the floadway or its adoption by communities participating in the NFIP? <br />D Ves IZI No <br /> <br />f Yes~ attach a copy of a letter notifying the appropriate State agency of the floodway revision and documentation of the <br />approval of the revised f100dway by the appropriate State agency. <br /> <br />2. Does the development in the f100dway cause the 1 % annual chance (base} elevation to increase at any location by more <br />than 0,000 feet? D Ves D No IZI N/A <br /> <br />3. Does the cumulative effect of all development that has occurred since the effective SFHA was originally identified cause the <br />base flood elevation to increase at any location by more than one foot (or other increase limit if community or state has <br />adopted more stringent criteria, even if a floodway has not been delineated by FEMA)? DYes IZI No <br /> <br />If the answer to either items is Yes, please attach documentation that all requirements of Section 65.12 of the NFIP regulations <br />have been met. regarding evaluation of alternatives. notice to individual legal property owners, concurrence of CEO. and <br />certification that no insurable structures are impacted. <br /> <br />5. MAINTENANCE RESPONSIBILITY <br /> <br />The community is willing to assume responsibility for ~ performing [:gI overseeing compliance with the maintenance <br />and operation plans of the Pawnee Creek Overflow Interceotor Channel <br />(Name) <br />flood control structure. If not performed promptly by an owner other than the community, the community will provide the <br />necessary services without cost to the Federal government. <br /> <br />Operation and maintenance plans are attached. <br /> <br />DYes IZI No <br />6. REVIEW FEE <br /> <br />D N/A <br /> <br /> <br />The review fee for the appropriate request category has been included. [:gI Yes Fee amount: $3.100.00 <br />OR <br />This request is based on a federally sponsored flood-control project where 50 percent or more of the project's cost is <br />federally sponsored, or the request is based on detailed hydrologic and hydraulic studies conducted by Federal. State, or <br />local agencies to replace approximate studies conducted by FEMA and shown on the effective FIRM; thus the project is fee <br />exempt, D Ves <br /> <br />Please see Instructions for Fee Amounts <br /> <br />7. SIGNATURE <br /> <br />Note: I understand that my signature indicates that all information <br />submitted in support of this request is correct <br /> <br /> <br />Craie D. Jacobson. EIT. Proiect Enoineer <br />Printed Name and Title of Revision Requester <br /> <br />ICON Enaineerina. Inc. <br />Company Name <br /> <br />Tele hone No.: 303-221-0802 Date: 10/30/01 <br />CERTIFICATION BY REGISTERED PROFESSIONAL ENGINEER <br />AND/OR LAND SURVEYOR <br />This certific~CO~FR Ch, 1, Sect 65,2 <br /> <br /> <br />, Signature <br /> <br />Ron Enserro. PE. Proiect EnQinee( <br />Printed Name and Title of Revision Requester <br /> <br />egistr No. 33131 Expires (Date) 10/02 State.c.Q <br /> <br />Type of license/Expertise: Civil <br /> <br />Note: Signature indicates that the community understands. from the <br />revision requester, the impacts of the revision on flooding conditions <br />in the :tunity, <br /> <br /> <br />~ s~dmmunitY Official <br />_ CeDt-jf!. 13- G o"JI. <br />Printed Name and Title of Community Official <br />_C../y 8 (! 5.{<-v(~ '^j <br />Community Name <br /> <br />Tele hone No.: q?O-S-.u.-9?~:te: -- 0 J <br />Check which forms have been included with this request <br /> <br />FORn Name and (Number) <br />D Hydrologic (3) <br />[SJ Hydraulic (4) <br />IZl Mapping 151 <br />[2J Channelization (6) <br />IZl Bridge/Culvert (71 <br />D levee/Floodwall (8) <br />o Coastal 191 <br />D Coastal Structures (1 OJ <br />o Dam (111 <br />o Alluvial Fan (12) <br /> <br />Reauired if ...... <br />new or revised discharges <br />new or revised water-surface elevations <br />floodp!ain/floodway changes <br />channel is modified <br />addition/revision of bridge/culvert <br />addition/revision of levee/floodwall <br />new or revised coastal elevations <br />addition/revision of coastal structure <br />addition/revision of dam <br />structures proposed on alluvial fan <br /> <br />FEMA Form 81-89 <br /> <br />Revision Requester and Community Official Form <br /> <br />MT -2 Form 1 Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.