Laserfiche WebLink
<br /> ~, <br /> / ,f'- J <br />/ j <br /> FLOOD RELATED COSTS <br /> 5/10/84 THROUGH 6/J0/ SLf <br />( Previously Additional Proj ec tcd Totals <br /> Submitted Costs <br />~~~nl~l~e Labor <br /> Overtime & Temporal-Y <br /> 7/., FlCA 7339.67 <br /> 513.78 <br />Police Overtime 2289.85 <br />t'laintenance 2623.30 2310.00 <br />rl FICA 183.63 197.00 <br />10 <br /> Sub Total 7853.45 5096.78 3007.00 15957.23 <br /> <br />Contracted Equipment & Labor <br />--. <br />Morgan Excavating 2160.00 <br />Dick Wisect\p 200.00 <br />Terry Trout - Welding 735.00 <br />Morgan Excavating <br /> (Laying Temporary Pipeline) 3000,00 <br /> Sub Total 2360.00 735.00 3000.00 6095.00 <br />.;Ot1S t ruc t ion - Replacement ~. <br />D & D Consultants - Culverts 612.80 <br />D & D Consultants - Supply line 2554.25 <br />Dodson - Coupling - Tempor- <br /> ary line 1446,77 36,00 <br />Dodson - Pipe " " 9890.00 <br />Pierce - Ells " " 899.88 <br /> Sub Total 4613.82 10825.88 -0- 15439.70 <br /> <br />Ii scc] laneous <br /> <br />Sand Mags MJK Feed <br />~;'lnd ~lPM <br />Tire Replcmnt Sinclair 131 <br />Weston Oil - Diesel Fuel <br />Gasoline Sinclair 131; <br />Transfer Case - 1981 Ford ; <br />(Damaged 5/14/84) <br /> <br />64. LfO <br />139,80 <br />130.00 <br />2471.01 <br /> <br />. " <br /> <br />III' <br /> <br />Sub Total <br /> <br />Ii' <br />2705.:21 . <br />$115J2U~d:' ' <br /> <br />~ljli <br /> <br />Grand Total <br /> <br />I, <br /> <br />, <br />; I ~ <br /> <br />1259.95 <br />,53.55 <br />It :11 I: i. <br />:' I <br />1020.00 " <br />I', ,)': i. i <br />2333'.50 <br />i" I'll,' ill <br />18991.16 <br /> <br />': '1.1 "'j,,I" <br />"Ii Ii <br />" <br />"I i <br />I I <br /> <br />-0- <br />6007.00 <br /> <br />5038.71 <br />42530.64 <br />