Laserfiche WebLink
<br />'d3'.' <br />~,,- ,- q <br /> <br /> <br />.' ./0'- '" . <br /> <br />. <br /> <br />. <br /> <br />~ <br /> <br />r f{ l/l-%<I <br /> <br />6 ft Arch Pipe County Road 179 Just off state 133 @ O&RGW <br /> <br />Tracks. Length 45 ft Damage = Rerroved by equiprent'due <br /> <br />to heavy washing and dam effect. Estimate: $10.,0.0.0. <br /> <br />(7) 6 ft Arch Pipe COunty Road 33 @ 179 @ Middle Creek Crossing <br />Length sa ft Dronage - Road washed OJt. Estimate: $10.,0.0.0..0.0. <br /> <br />(8) 3 Culverts One each: 4 ft, 5 ft, 7 ft all around County <br /> <br />Road 29 at Willow Creek. Estimate: $10.,000..00. <br /> <br />(9) 2 Q.llverts 7ft X 9 ft each COunty Ibad 74 at Dry Creek. <br /> <br />Estimate: $12,00.0..0.0. <br /> <br />c. M.1d flows and slides due to undercut and highwater <br /> <br />(1) Co..Inty Road 27 5 miles north of Oak Creek. NUlrerous <br />slides - two. extrenely large cutting OJt one lane for 30.0. ft. <br />Estimate $50.0.,0.0.0. (Engineer's estimate) <br />(2) COunty Ibad #55 !Xu1kley Pass rod flow. Massive in size. <br /> <br />Closes off only winter access to area. Estimate $50.0.,0.0.0..0.0. <br /> <br />(Engineer's estinate). Snowblow back access = cost = $6,0.0.0..0.0. <br /> <br />Preliminary clean-up prior to rrajor ITDverrent $24,0.0.0.0.0. <br /> <br />(3) COunty Ibad #25 1\long Oak Creek - mud slide took out <br />200. ft of roadway including Oak Creek Municipal water line. <br /> <br />Estimate: $10.,0.0.0..0.0. <br /> <br />d. Road Wash C>..lts <br /> <br />(l) Co..Inty Road 179 ~ mile from State 131. llidercut by Oak <br />Creek. 10.0. ft long full width to cut slope. Estimate: $15,0.0.0..0.0. <br />(2) COunty Road 52 i'Olf Creek 5 miles north of US 40.. <br /> <br />Reconstruction of ~ mile of road. <br /> <br />(3) Co..Inty Road 27 12 miles nort:hwest of Oak Creek, at <br /> <br />, <br />Fish Creek. 5 ft culverts held; excess run-off topped road <br /> <br />. <br />I <br /> <br />and ate out 79 ft long stretch of asphal_t~_~ ~_thi,gh_~,_, . <br />_A___~_~'~__'_ --~~~-~-~~-------- ~----'-- ".-- - <br />fill. Creek relocating itself. Estimate: $50.,0.0.0..0.0. <br />(4) O::mlunity of Milner, access road to sewer system, $70.0..0.0 <br /> <br />t.. ~ - '. <br /> <br />,. <br /> <br />wash-oot damage. <br /> <br />2. Expenses since 0.50.184 for errergency rreasures: <br /> <br />a. Purchase of 20.,0.0.0. sandbags at 29 cents each, equal $5,80.0..0.0. <br /> <br />'. '.;~T~~'~\. ' <br /> <br />b. Portable toilet rental for Town of Oak Creek, total $2,10.0..0.0. <br />c. Purchase of terrporary bridge for Town of Oak Creek. Bridge 40. ft <br />long by 14 ft wide. Cost: $19,0.0.0..0.0. Will be retained by ~ty <br /> <br />for future errcrgency use. <br /> <br />d. Installation of bridge cited in 2 c above: Crane ClOst $812.50., <br />gravel, labor and other cquiprent $4,QO~..Oa. <br />