My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06791
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06791
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:09:58 PM
Creation date
10/5/2006 2:30:57 AM
Metadata
Fields
Template:
Floodplain Documents
County
Hinsdale
Community
Lake City
Stream Name
Henson Creek
Basin
Gunnison
Title
Henson Creek Flood Control Improvements
Date
12/1/1985
Prepared For
Lake City
Prepared By
Westwater Engineering
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />HENSON CREEK FLOOD CONTROL IMPROVEMENT <br />PREcIM:NARY DESIGN INFORMATION <br /> <br />PART I <br />PURPOSE AND SCOPE <br /> <br />Introduction. This submittal includes the preliminary design and supporting <br />information for construction of a flood protection berm on Henson Creek in <br />Lake City. Included in this submittal are: <br />1. A narrative report describing the existing situation and design <br />criteria and data (Part II). <br />2. Hydrologic and hydraul ic data from the recently completed Flood <br />Plain Report for Lake City (Part Ill). <br />3. A preliminary design consisting of profiles, cross-sections, and <br />estimated quantities and costs (Part IV). <br />4. General construction specifications for the project, (Part V). <br /> <br />Location. The project will consist of installing flood protection berms <br />(levees) on Henson Creek, from the Gunnison Avenue Bridge approximately 800 <br />feet upstream to a point where Henson Creek emerges from a narrow, steep- <br />walled canyon. The proj ect will be entirely within the Town limits of <br />Lake City. <br />Need for Proj ect. The purpose of the proj ect wi II be to prevent Henson Creek <br />fran over-topping its banks or eroding stream channels in the proj ect reach <br />during floods exceeding the 100 year flow. With the completion of this <br />proj ect, all portions of both Henson Creek and Lake Fork of the Gunnison <br />channels within the Town of Lake City will have flood protection berms <br />sufficient to prevent damage during the 100 year flows. <br />Authorization. This preliminary report and design has been authorized by the <br />Town of Lake City with support fran the Colorado Water Conservation Board. <br />Application of Design Information. Due to the limited field information <br />available, the alignment and cross-sections are approximate only. Informa- <br />tion in this report is limited to the following applications: <br />1.) developing a proj ect construction budget and <br />2.) as guidelines for construction by Town and County crews, <br />in conj unction with a field design by an Engineer. <br /> <br />1-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.