<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />
<br />PROFESSIONAL RECORD
<br />
<br />IVIAX K. KUEHL
<br />
<br />EDUCATION
<br />
<br />Civil and Structural Engineering Degree, Government Technical College, Coburg,
<br />Germany, 1949.
<br />
<br />SPECIALTIES
<br />
<br />Planning * Design of Dams * Power Plants * Tunnels
<br />Feasibility Studies * Scheduling
<br />
<br />*
<br />
<br />Hydrau Ii c Structures *
<br />
<br />EXPERIENCE (1949 to date)
<br />
<br />Chief Engineer, Engineering Consultants, Inc. Responsible for all technical matters
<br />within the company.
<br />
<br />As Chief Civil Engineer, Responsible for design of civil and structural features of all ECI
<br />projects, also for economic and technical feasibility studies, reconnoissance reports on
<br />water resources projects, interpretation of site exploration, and preparation of construc-
<br />tion specifications and tender documents. Major projects included: Nan River Multi-
<br />purpose Project, Thailand; Upper Pampanga River Project, Philippines; Samanala Wewa
<br />Multipurpose Project, Ceylon; Pranburi Irrigation Project, Thailand; and Thaukyegat
<br />Hydroelectric Project, Burma. Consultant on design and structural.problems for multiple
<br />arch dam designed by Construtora Ferraz Caval conti S.A. of Santa Catarina, Brazil.
<br />
<br />Assistant Chief Civil Engineer. Responsible for design of civil and structural features of
<br />Kremasta Hydroelectric Project, Greece and Kong Krachan Multipurpose Project, Thailand.
<br />
<br />Head, Civil Design Department, Crippen Wright Engineering Ltd., Vancouver, B.C.,
<br />Canada. Responsible for economic and feasibility studies, layout, design, specifications
<br />and construction drawings for: 500 megawatt hydropower development on South Saskatchewan
<br />River; rockfjll dam, outlet tunnel and control works, Port Mellon, B.C.; earthfill dam, spill-
<br />way, power canal, penstocks and 300 megawatt power plant, Squaw Rapids Development,
<br />Saskatchewan; Seymour Falls concrete buttress dam and appurtenant works, Vancouver, B. C.
<br />
<br />Design Supervisor, Western Consulting Ltd., Vancouver, B. C., Canada. Responsible for
<br />design of foundations and superstructures for pulp and poper mills including recovery build-
<br />ings, boiler and turbine houses, recausticizing buildings, power buildings and 320-foot
<br />reinforced concrete chimney.
<br />
<br />Design Engineer and Assistant Project Engineer, Rhein-Main-Donau A. G., Munich,
<br />Germany. Prepared layouts, specifications and construction drawings for run-of-the-
<br />river power plants, small dams, reguloting gates and shipping locks.
<br />
<br />Member: Fellow, American Society of Civil Engineers, United States Committee on
<br />Large Dams, American Concrete Institute, International Society for Rock Mechani cs.
<br />
<br />Registered Professional Engineer: Colorado. Certified Consulting Engineer: Colorado.
<br />
<br />~
<br />
|