Laserfiche WebLink
<br />( <br /> <br />( <br /> <br /> BID TABUlATION <br /> RIO GRANDE LEVEE IMPRO\lEMENI'S - PHASE II <br /> JULY 3D, 1987 1: 00 P.11. <br />Item Estimated Southway Construction Anderson Construction <br />NurrlJer Description Quantity Unit Price Total Pr ice Unit Price Total Price <br />- <br />1. r-bbilization IS $ 10,000.00 $ 10,000.00 $ 15,000.00 $ 15,000.00 <br />2. Water Control IS $ 2,000.00 $ 2,000.00 $ 2,500.00 2,500.00 <br />3. Raroval of Structures & Obstruction <br /> including site Clearing IS $ 12,500.00 $ 12,500.00 $ 10,000.00 $ 10,000.00 <br />4. Rarove Trees 52 EA $ 100. 00 $ 5,200.00 $ 50.00 $ 2,600.00 <br />5. Topsoil Stripping 1,500 CY $ 1.00 $ 1,500.00 $ 1.15 $ 1,725.00 <br />6. Levee Site Excavation $ 51,740.~0 <br /> including haul/disposal 19,900 CY $ 2.00 $ 39,800.00 $ 2.60 <br />7. BorrcM Site Excavation/ <br /> Haul to Levee Site 7,700 CY $ 3.00 $ 23,100.00 $ 3,35 $ 25,795.00 <br />8. levee Fill/Zone I 7,000 <br /> Zone II 4,100 11,100 CY $ 1.50 $ 17 ,100. 00 $ 1.90 $ 21,660.00 <br />9. Structure Backfill 20 CY $ 10.00 $ 200.00 $ 40.00 $ 800.00 <br />10. Topsoil PlaCEment 1,100 CY $ 2.00 $ 2,200.00 $ 1. 00 $ 1,100.00 <br />11. Ripmp 4,500 CY $ 20.00 $ 90,000.00 $ 20.20 $126,900.00 <br />12, Bedding Material for Riprap 2,100 CY $ 7.00 $ 14,700.00 $ ]].40 $ 23.940.00 <br />13. Bedding Material for Under- <br /> drain 470 CY $ 10.00 $ 4,700.00 $ 20.00 $ 9,400.00 <br />14. Pipe Ilcdding 55 CY $ 6.00 $ 330.00 $ 20.00 $ 1,100.00 <br />15. 4-foot Di<lll'eter Slab Base 6Ea <br /> Manholes $ 1,000.00 $ 6.000.00 $ ],000,00 $ 6,000.00 <br />16. 6-foot Oi<lll'eter Slab Base <br /> Flat lid Manholes 1 EA $ 2,000.00 $ 2,000,00 $ 2,000,00 $ 2,000.00 <br />17. 8-inch Diameter Perforated PVC <br /> Pipe, ASTM D3034, SDR-35 1,738. LF $ 10.00 $ 17,380.00 $ 7,55 $ 13 ,121. 90 <br />