Laserfiche WebLink
<br />Location <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet)* <br /> <br />Just upstream of Pike Road <br />Approximately 2,100 feet downstream <br />of Hover Road <br />Just downstream of Hover Road <br />Approximately 200 feet upstream <br />of Hover Road <br />Approximately 700 feet upstream of <br />Hover Road <br /> <br />4,975 <br /> <br />4,975 <br /> <br />4,979 <br />4,9B7 <br /> <br />4,98l <br />4,987 <br /> <br />4,989 <br />4,992 <br /> <br />4,99l <br /> <br />4,992 <br /> <br />*National Geodetic Vertical Datum, rounded to nearest whole foot <br /> <br /> <br />Under the above-mentioned Acts of 1968 and 1973,' the Mitigation <br /> <br />Directorate must develop criteria for floodplain management. <br /> <br />For the <br /> <br />community to participate in the National Flood Insurance Program (NFIP), the <br /> <br />community must use the modified BFEs to administer the floodplain management <br /> <br />measures of the NFIP. These modified BFEs will also be used to calculate the <br /> <br />appropriate flood insurance premium rates for new buildings and their <br /> <br />contents and for the second layer of insurance on existing buildings and <br /> <br />contents. <br /> <br />Upon the second publication of notice of these changes in this <br /> <br />newspaper, any person has 90 days in which he or she can request, through the <br /> <br />Chief Executive Officer of the community, that the Mitigation Directorate <br /> <br />reconsider the determination. Any request for reconsideration must be based <br /> <br />on knowledge of changed conditions or new scientific or technical data. All <br /> <br />interested parties are on notice that until the 90-day period elapses, the <br /> <br />Mitigation Directorate's determination to modify the BFEs may itself be <br /> <br />changed. <br />