My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06672
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:09:38 PM
Creation date
10/5/2006 2:27:05 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Crook
Stream Name
South Platte River
Basin
South Platte
Title
South Platte River at Crook
Date
10/1/1993
Prepared For
Crook
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2. <br /> <br />Part,s: (Consolidated <br />Elec'trlc) <br />Model :[.5 J>1oat Switch <br /> <br />MC Squal:'ed <br /> <br />Canyon sys. <br /> <br />$ 44.76 <br /> <br />$ 65.00 <br /> <br />4.4 Plan of Pro,:edlu'e for Building Alarm Gages <br />4.4.1 Before Construction <br />1. Determin,e if phone service is available at the site <br />for i~ l~easonable installation feE!; <br />2. Acquire permission to build the :stilling well near <br />the :dver and mount the instrument shelter on highway <br />righ't-()f'-~'ay . <br />3. Determine the length of CMP required. Estimate the <br />number elf brackets and fittings :required to attach <br />the ,;tH:U.ng well and staff gage to the piling. <br />4. Purcha!;.~ 1:he instrumentation (1 i:'l'ted in parts 4.3.2- <br />4.3.4) " <br />5. Select: and purchase an apprc'priate instrument <br />shell:er. <br />6. Purchase the required culvert pipe (a 30" eMP is <br />reCOIDmemdE,d for the Sterling gage) and accessories. <br />7. Have the eitilling well fabricated from the CMP. That <br />work irH::l1..1des: <br />a. A1:tach pipe collar at t:op to facilitate <br />at1:achment of the steel plata lid. <br />b. Henna the cleanout door made" <br />8. Determine who the tape dialer will call and prepare <br />the \7arning message. <br />9. PrograDl 'I:he alarm dialer tape us Lng the instructions <br />provJ.dE!c1 with the Ademco 618 Alarlll Dialer. <br />10. Purchaeie remaining fittings. <br />11. Line up a construction crew and needed tools and <br />equipmE!n1::, , <br /> <br />4 .4.2 Constructicm, <br />1. Drive r-beam piling at stilling well site and dig <br />hole fell:' stilling well. <br />2. Moun1: l:he instrument she I ter on treated posts near <br />the higrhl.ray. <br />3. Attae:h 81;,,1lling well to piling. <br />4. Dig 1:rench for 6-conductor cable from stilling well <br />to inst,rument shelter. Lay the C~ll! in the trench. <br />5. Attach conduits to shelter and stilling well to carry <br />6-conduct:or cable and phone line" Thread the cable <br />into botb the stilling well .bd the instrument <br />shel. ter' . <br />6. Attach floats to the float rod~. Do not cut off <br />extra, fl.c)at electrical cable. <br />7. Attach a piece of 3/4" plywood to the back of the <br />alanl Eih,alter. This will be used to mount both the <br />alanll dieller and the phone jack. <br />8. Mount the~ Alarm Dialer to the plyirooel. <br />9. Hook the float cables to the 6"conductor cable in <br />the junction box near the top o~ the stilling well <br />(see Figl.lre 6). <br /> <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.