My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06661
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:09:36 PM
Creation date
10/5/2006 2:26:35 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Mitigation Success Stories in the United States
Date
10/10/1991
Prepared By
Association of State Floodplain Managers
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Town of Greybull Levee Protection <br /> <br />In August 1998 the Wyoming National Guard, 133rd Engineering Company <br />completed a streambank stabilization project adjacent to the Town of Greybull, <br />Wyoming on the Big Horn River The streambank in front of a levee protecting the <br />town was eroding away. The erosion occurred during spring high water. The Big Horn <br />River is regulated by the Boysen Reservoir 85 miles south of Greybull. <br /> <br />During periods of excessive spring runoff, the river level has come within ten inches of <br />overtopping the levee. The streambank is composed of mostly sand, with the <br />remainder comprised of a silt/ clay mix. In preceding years, the river flow had created <br />a gravel bar which was channeling the flow toward the bank in front of the levee. The <br />bank was eroding at the rate of approximately 8 to 10 feet annually. <br /> <br />The U. S. Army Corps of Engineers, Omal1a District Hydrologic Engineering Division <br />recommended construction of a jetty system to move the river back from the levee. <br />Since the water often reaches or exceeds the bank top elevation, the sides and top of <br />the jetties are constructed of rock. This construction should permit the high water to <br />flow over the jetties and still push the current far enough into the main channel to <br />attack the gravel bar. A twenty foot shift in channel flow would match the anlOunt of <br />bank loss documented over recent years. In addition to adding to the overall stability <br />of the bank, the channel movement might reduce the effect of high water along the <br />bank seeping Into a gravel vein which runs under the levee. The water seepage does <br />not pose a structural problem for the levee, but the water floods basements in the area. <br /> <br />Plarming for the jetties construction project began in September 1995. The Town of <br />Greybull purchased all the material utilized to construct the jetties and the Wyoming <br />National Guard, 133rd Engineering Company constructed the jetties. This mitigation <br />project has an estimated value of 5300,000. No FEMA funding was utilized in this <br />project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.