My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06661
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:09:36 PM
Creation date
10/5/2006 2:26:35 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Mitigation Success Stories in the United States
Date
10/10/1991
Prepared By
Association of State Floodplain Managers
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />These eight permanent lift stations eliminate the need for temporary emergency pump <br />operations during flood conditions. Since permanent pumps offer capacities ranging <br />from 6 to 20 times greater than portable temporary pumps, the permanent installations <br />offer much greater protection with minlmal setup and operator intervention. It is <br />estimated that these pump stations reduce damages and flood protective costs by <br />approximately $800,000 for a 10-year flood occurrence. <br /> <br />The City believes that these projects are extremely successful in in1proving flood <br />preparedness and rninin1izing flood damages. <br /> <br />PROJECT COSTS <br />$700,000 for 8 Sites <br /> <br />FUNDING SOURCES <br />FEMA- HMGP <br />North Dakota <br />CDBG <br />Local <br />
The URL can be used to link to this page
Your browser does not support the video tag.