Laserfiche WebLink
<br />- 41 - <br /> <br />TABLE 8a - BENEFITS AND COSTS BY CONSTRUCTION UNITS <br /> <br />c. <br />~, <br /> <br />t <br />~. <br />i <br /> <br />Franktown-Parker Watershed, Colorado <br /> <br />(Dollars) );.1 <br /> <br />f <br />I <br />I <br /> <br />. <br /> <br /> Annual Annual i <br />Construction Unit and Structures Benefits Cost , <br />Land Treatment for Flood Prevention <br />Fire Protection and Control 507 407 <br />Construction Unit No. 1 <br />Structure Nos, FP-Bl, PI, 81, El, <br />E2 and E2FD, E4, E5, E6, and E3. 15,248 11, 034 <br />Construction Unit No, Z <br />Structure Nos. FP-E8, Rl, R2, .n, <br />111, E7, and E9, 17,919 12,326 <br />Construction Unit No. 3 <br />Structure Nos. FP-A3, AI, A2, A.I, <br />AS, and A6, 9,550 6,005 <br />Construction Unit No. 4 <br />Structure Nos, FP-LGl and LG2. 5,343 4,059 <br />TarAL 48,567 33,831 <br /> , <br /> <br />" <br />" <br />, <br />. <br /> <br />i <br />Ii: <br />~ <br />" <br /> <br /> <br />I <br /> <br /> <br />, <br />f <br /> <br />)) <br /> <br />Price Base:Benefits <br />Cost <br /> <br />Long-term prices, <br />- 1959 Prices <br /> <br />Date: April 1960 <br /> <br />~-'; <br /> <br />, <br /> <br />