Laserfiche WebLink
<br />TABLE OF CONTENTS <br /> <br />Page <br /> <br /> <br />! <br /> <br />, <br />~' <br />1f <br />" <br />~ <br />~. <br />~ <br /> <br />SECTION 1 _ WATERSHED WORK PLAN 1 <br /> <br />SUMl.1ARY OF PLAN 1 <br /> <br />DESCRIFTION OF THE I-IATERSHED 4 <br />Physical Data 4 <br />Economic Data 8 <br /> <br />i <br />I <br />i <br /> <br />, <br /> <br />WATERSHED PROBLEMS 9 <br />Floodwater Damage 9 <br />Sediment Damage 9 <br />Figure 1- Problem Location Map <br />Erosion D&~age 10 <br />Fire Protection 10 <br />Problems Relating to Hater Management 10 <br /> <br />EXISTING OR PROPOSED WORKS OF nWROVBlliNT 11 <br /> <br />"fORKS OF IHPROVEMENT TO BE INSTALLED 11 <br />Land TreaUOlent Measures for Watershed Protection 11 <br />Land Treatment Measures for Flood Prevention 12 <br />Structural Measures for Flood Prevention 12 <br />Table 1 _ Estimated Project Installation Cost 13 <br /> <br />~ <br />. <br />k <br />I <br />E <br />~ <br />;~ <br /> <br />14 <br />BENEFITS FROM HORKS OF IHPROVEMENT 14 <br />Figure 2 - Structure Location Map <br />Figure 3 _ Typical Floodwater-Retarding Structure <br /> <br />COHPARISON OF BENEFITS AND COSTS 15 <br /> <br />i <br /> <br />~ <br /> <br />ACCOMPLISHING THE PLAN 15 <br />Land Treatment Measures for Watershed Protection 16 <br />Land Treatment Measures for Flood Prevention 16 <br />structural Measures for.Flood Prevention 16 <br /> <br />PROVISIONS FOR OPERATION AND MAINTENANCE 17 <br />Land Treatment Ileasures for Watershed Protection 17 <br />Land Treatment Heasures for Flood Prevention IS <br />Structural Ileasures for Flood Prevention 18 <br /> <br />COST SHARIdG 18 <br /> <br />CONFORMANCE OF PLAN TO FEDERAL AND STATE LAHS AND <br />REGULATIOIJS 19 <br />