Laserfiche WebLink
<br />.. <br /> <br />. <br /> <br />2 <br /> <br />the FIRM has been revised to eliminate a discrepancy between the effective FIRM and the Flood Profile <br /> <br />in the effective Flood Insurance Study report. The table below indicates the modified BFEs for several <br /> <br />locations along the affected length of Dry Creek and South Valley Dry Creek. <br /> <br />Location <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet) * <br /> <br />Dry Creek: <br />Approximately 350 feet upstream of Dancing Horse <br />Drive <br />Downstream limit of detention pond southeast of <br />intersection of Woodmen Road and Orchard <br />Valley Road <br />Upstream limit of detention pond <br />Approximately 500 feet upstream of intersection of <br />Orchard Path Road and Orchard Valley Road <br /> <br />6,569 <br /> <br />6,575 <br /> <br />6,608 <br />6,622 <br /> <br />6,613 <br />6,613 <br /> <br />6,678 <br /> <br />6,678 <br /> <br />South Valley Dry Creek: <br />Approximately 150 feet upstream of intersection of <br />Orchard Path Road and Orchard Valley Road <br />Approximately 225 feet upstream of intersection of <br />Orchard Path Road and Orchard Valley Road <br />Approximately 550 feet upstream of intersection of <br />Orchard Path Road and Orchard Valley Road <br />Approximately 1.150 feet upstream of intersection of <br />Orchard Path Road and Orchard Valley Road <br /> <br />6,675 <br /> <br />6,670 <br /> <br />6,678 <br /> <br />6,678 <br /> <br />6,676** <br /> <br />6,703 <br /> <br />6,703** <br /> <br />6,708 <br /> <br />*National Geodetic Vertical Datum, rounded to nearest whole foot <br />**Elevations shown on effective FIRM dated March 2, 1989 <br /> <br />Under the above-mentioned Acts of 1968 and 1973, the Mitigation Directorate must develop <br /> <br />criteria for floodplain management. For the community to participate in the National Flood Insurance <br /> <br />Program (NFIP), the community must use the modified BFEs to administer the floodplain management <br /> <br />measures of the NFIP. These modified BFEs will also be used to calculate the appropriate flood <br /> <br />insurance premium rates for new buildings and their contents and for the second layer of insurance on <br /> <br />existing buildings and contents. <br /> <br />Upon the second publication of notice of these changes in this newspaper, any person has 90 days <br /> <br />in which he or she can request, through the Chief Executive Officer of the community, that the Mitigation <br />