My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06614
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06614
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:09:28 PM
Creation date
10/5/2006 2:24:41 AM
Metadata
Fields
Template:
Floodplain Documents
County
Ouray
Community
Ouray
Stream Name
Uncompahgre River
Basin
Gunnison
Title
Debris and Flood Control Plan for Portland and Cascade Creeks
Date
10/25/1982
Prepared For
Ouray County
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />Table 3.1 <br /> <br />Table 3.2 <br /> <br />Table 3.3 <br /> <br />Table 3.4 <br /> <br />Table 3.5 <br />Table 3.6 <br />Table 4.1 <br />Table 4.2 <br />Table 4.3 <br /> <br />Table 4.4 <br /> <br />Table 4.5 <br />Table 5.1 <br />Table 5.2 <br />Table 5.3 <br />Table 5.4 <br />Table 5.5 <br />Table 5.6 <br />Table 5.7 <br /> <br />, <br /> <br />! <br /> <br />" <br /> <br />LIST OF TABLES <br /> <br />Summary of General Basin Characteristics ' ,..". <br /> <br />Rainfall Depths for 30-Minute, I-Hour and 24-Hour Storms <br /> <br />Peak Discharges for 24-Hour Storm. <br /> <br />Summary of Floods on Tributaries at Ouray, Colorado <br /> <br />Damage Estimate Summary . <br /> <br />Annual Flume Repair Costs <br /> <br />Portland Flume Capacity for Water Only <br /> <br />Cascade Flume Capacity for Water Only , <br /> <br />Portland Flume Capacity for Water and Debris <br /> <br />Cascade Flume capacity for Water and Debris. <br /> <br />Results of Impact Calculations for Various Flow Conditions <br /> <br />Improvements Considered for Portland Creek <br /> <br />Improvements Considered for Cascade Creek <br /> <br />Unit Costs <br /> <br />Portland Creek phase IA Cost Estimate <br /> <br />Portland Creek Phase IB Cost Estimate <br /> <br />Portland Creek Phase II Cost Estimate <br /> <br />Cascade Creek Phase IA Cost Estimate <br /> <br />Table 5.8 Cascade Creek Phase IB Cost Estimate <br /> <br />Table 5.9 Cascade Creek Phase II Cost Estimate <br /> <br />Table 5.10 Comparison Between Replacement and Repair Costs <br /> <br />Table 5.11 Capital Cost Summary . . . . . . , . . . <br /> <br />vi <br /> <br />Page <br /> <br />3.6 <br />3.7 <br />3.8 <br />3.21 <br />3.24 <br />3.25 <br />4.7 <br />4.8 <br />4.9 <br />4.10 <br />4.14 <br />5.3 <br />5.5 <br />5.15 <br />5.16 <br />5.17 <br />5.18 <br />5.24 <br />5.25 <br />5.26 <br />5.28 <br />5.32 <br /> <br />( <br />
The URL can be used to link to this page
Your browser does not support the video tag.