My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06564
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:09:20 PM
Creation date
10/5/2006 2:23:12 AM
Metadata
Fields
Template:
Floodplain Documents
County
Boulder
Community
Boulder
Stream Name
Goose, Wonderland, Elmer's Twomile, 2-mile, 4-mile
Basin
South Platte
Title
Major Drainageway Planning Volume 1, Part B
Date
4/1/1969
Prepared For
Boulder County
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />3 <br /> <br />i I <br /> <br />I <br /> <br />encroachment because of urbanization and because of natural processes <br />whereby sand and gravel debris deposited by floods has filled in <br />the channels. <br /> <br />PflOCEDUHE <br /> <br />I <br /> <br />I <br /> <br />The procedure "as to define the problem hydroloCi~ally and hydrau- <br />lical ly by field and office studies, to develop all practical alter- <br />nates, and to study these alternates using a qualified environmental <br />design team approach. A dialogue waS then establ ished Ivith the City <br />and County where findings were presented in an objective manner, <br />coupled V/ith recommendations, Channel route decisions were made <br />and the process of preparing detailed master plans was commenced. <br />Jesign criteria developed by the Denver Regional Council of <br />GovcrllLlents was fully uti 1 ized, this design criteria being that <br />presented in the Urban Storm Drainage Criteria Manual dated <br />narcil, 1965. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />T:,e financing strategy was developed concurrently "ith the <br />master planning by a team of three, consisting of an engineer, <br />a lawyer, and an urban planner, all of whom are experienced in <br />municipal financing problems. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />II <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.