My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06541
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06541
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:09:16 PM
Creation date
10/5/2006 2:22:01 AM
Metadata
Fields
Template:
Floodplain Documents
County
Garfield
Community
Carbondale, Marble
Stream Name
Crystal River
Basin
Colorado Mainstem
Title
Marble Community File
Date
1/1/2001
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />August 28, 1973 <br /> <br />Mr. Derly Gingery <br />Frasier & Gingery <br />2840 South Vallejo Street <br />Englewood, Colorado 80110 <br /> <br />Dear Deryl: <br /> <br />In discussions with the staff of the Colorado Land Use Commission, we <br />have agreed upon the following precedure to be used in implementing the <br />corrective measures recommended in the report prepared by the Colorado <br />Geological Survey as presented to the Land Use Commission at its July 25, 1973, <br />meeti ng. <br />We consider the following steps desirable both because of the urgency of <br />implementing the corrective steps, and because of the limited staff <br />time on the part of state agencies to review our work on a day to day <br />basis: <br /> <br />(1) As the engineering is completed for a specific project, a <br />written report will be prepared by your office and distributed to the Land <br />Use Co~mission, the State Geologist, and the County Engineer. <br /> <br />(2) The above report will include the date when representatives of <br />your firm will be in the field for staking or other field work. <br /> <br />(3) Following your field work there will be a three day hold prior <br />to any construction activity, during which agency officials may visit the <br />site and review your work. <br /> <br />(4) In the event there is no adverse comment, construction is to pro- <br />ceed after the three day waiting period and a written report is to be <br />distributed indicating that the implementation has been accomplished. <br /> <br />I believe this procedure will enable us to move forward with deliberate <br />speed while providing for involvement on the part of the responsible <br />state bodies in any matters with which they are concerned. <br /> <br /> <br />4::& tliJL <br /> <br />Lawrence E. Hamilton <br />Executive Vice President <br /> <br />cc: <br /> <br />John Bermingham <br />Gunnison County Commissioners <br />Gunnison County Engineer <br />Gilbert F. McNeish <br />John Rold <br /> <br />MARBLkE~~f~REA. INC. <br />MARSLE. BOX 56C MARBLE STAR ROUTE 'CARBONDALE, COLO. 81624. (3031963.2044 <br />DENVER' 4155 E. JEWELL AVE. SUITE 316 'DENVER, COLO. 80222' (3031 758.1555v <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.