<br /> TABLE , (cont'd)
<br /> STRUCTURES A~ROSS TRISUTARY STREAM$--ELEVATION DATil.
<br /> Mile Top of
<br /> lder.t:ification Abo".. ~. ~n 0<
<br /> , Location ~~uth Streambed' Steel~ Roadway
<br /> - -
<br /> feet feet feet
<br /> Hospital Car.yon
<br /> Dirt ~"" 1.03 6,129.1 6,132.2 6,138.2
<br /> U.S. Highw~y 160,350~~ 0.29 6,001.7 6,007.7 6,0113.7
<br /> m lGilro~d 0.08 5,964.0 5,983.4 5,986.1
<br /> Colorado Canyon
<br /> Colorado f1i'lhl<ilY n 0.38 6,081.7 6,092.1 6,095.1
<br /> '" ~ (North 'track 0.16 6,065.1 6,073.7 6,076.4
<br /> '" ~ (South "rack) 0.15 6,064.9 6,072.3 6,075.6
<br /> AnSF Ralll<ay 0.10 6,061.3 6,077.3 6,082.6
<br />.
<br />,-
<br /> prospect Canyon
<br /> Colorado lIighw"y n 0.26 6,045.7 6,053.8 6,057.6
<br /> Park IIvenue 0.12 6,026.3 6,039.4 6,041.4
<br /> ATtSr R<iill<ay 0.03 6,015.3 6,031.4 6,034.8
<br /> FOl<ell A"I'QYo
<br /> Linden Avenue 1.36 6,000.3 6,010.7 6,015.2
<br /> I-2: Southlx>urul 1.11 5,980.3 5,992.9 5,997.1
<br /> I-25 NO"thbaund 1.08 5,979.5 5,991.9 5,998.1
<br /> m Railroad 0.93 5,970.3 5,984.1 5,990.7
<br /> Colorado HighwitY m ,.~ 5,946.6 5,968.3 5,970.6
<br /> A'l'&SF Railway 0.32 5,924.6 5,943.4 5,945.7
<br />
<br />~P.levations ~t upstream @nd of structure
<br />"f;"~t l>ldin Str"et
<br />
<br />Int""",.crliate
<br />Re'Jiona1
<br />F1oodCresto
<br />feet
<br />
<br />6,140.9
<br />6,013.8
<br />5,'J69.7
<br />
<br />6,099.6
<br />6,082.0
<br />6,081.0
<br />6,079.0
<br />
<br />6,064.1
<br />6,037.9
<br />6,025.2
<br />
<br />6,017.6
<br />5,991.9
<br />5,990.8
<br />5,982.1
<br />5,958.3
<br />5,941.1
<br />
<br />~^
<br />
<br />Standard
<br />Project
<br />Flood Cre5t~
<br />feet
<br />
<br />6,142.1
<br />6,019.6
<br />5,972.4
<br />
<br />6,102.2
<br />6,or13.0
<br />6,082.0
<br />6,080.0
<br />
<br />1>,065.2
<br />6,044.6
<br />6,028.4
<br />
<br />6,019.8
<br />6,002.7
<br />6,001.6
<br />5,994.8
<br />5,9&3.0
<br />5,947.5
<br />
<br /> TABLE , (cont'd)
<br /> STRUCTURES i\CROSS TRIBUTARY STREAHS--ELEVATIQN DATA
<br /> Mile 'op Intermediate Standard
<br /> Identification Above ~, Rail 0, Regional Project
<br /> , Location ~uth Streambed' Steel~ Roadl<ay Flood Crest. Flood Crest~
<br /> -
<br /> feet feet feet feet feet
<br /> Fishers Pe~k Arroyo
<br /> First Street 0.42 6,018.8 6,Jl29.7 6,034.1 6,025.7 6,033.8
<br /> Closed Conduit; 0.41 6,016.4 6,023.4 6,:123.0 6,030.6
<br /> C&S ~ 0.17 5,985.7 5,989.8 5,991.6 5,990.0 - H
<br /> C&5 ~ 0.05 5,971.1 5,981.1 5,983.5 5,978.5 5,981.0
<br /> C"' ~ 0.04 5,970.0 5,980.0 5,983.5 5,977.8 5,980.0
<br /> pinon Canyor.
<br />. Willow Street 0.71 6,064.8 6,073.0 6,074.5 6,073.6 6,016.6
<br />"
<br /> ~O. Street 0.63 6,053.3 6,063.0 6,063.4 6,060.2 6,064.4
<br /> Prospect Stre"t 0.~3 6,041.1 6,048.6 6,050.7 6,048.7 6,051.8
<br /> Kansas Avenue 0.45 6,036.1 6,045.8 6,046.3' 6,043.9 6,048.6
<br /> State Street 0.39 6,024.8 6,032.9 6,033.4~ 6,035.1 6,038.0
<br /> Nevada Avenue 0.32 6,016.5 6,024.0 6,026.4~ 6,028.4 6,030.3
<br /> Arizona Avenu" 0.25 6,008.6 6,015.0 6,018.4' 6,020.6 6,022.5
<br /> Colorado Avenue~" 0.19 6,003.1 6,011.7 6,015.5 6,018.4
<br /> II.T&SF Rail...ay 0.03 5,980.8 5,984.7 5,988.7 5,987.9 5,994.0
<br /> Pine Street 0.01 5,979.1 5,9139.8 5,990.5 5,987.9 5,994.0
<br />
<br />'Elevations at upstr@"-ID end of structure
<br />"Flow depth~ along Commercial Street are estimated to be in excess of 2.3 fee'
<br />~'oConduit is 915 feet long, running under Colorado Avenue, some businesses,
<br />and U.S. Highway 85-87.
<br />
|