<br />Colorado Flood Hazard Mitigation Plan -1999 :==:=-=--==
<br />
<br />..._-_._-------~-_._----_.._-------
<br />
<br />I I
<br />Colorado Water Conserv lion Board I
<br />Flood Control and Floodplain M~ aoement Section
<br />I I
<br />_~=. -~~ ,~~ ~7"= _ ""'~ ~ ""~ ~
<br />
<br />c, Prepare technical manuals of procedures and
<br />engineering methodologies in support of a and h
<br />above.
<br />
<br />d, Collect data and documentation of flood events,
<br />
<br />e, Provide coordination on federal studies and flood
<br />control projects when seeking Congressional
<br />authorization and funding, including study and i
<br />project reviews, as well as directing study efforts
<br />to ensure compliance with state standards and
<br />requirements,
<br />
<br />f, Provide general information and coordination to
<br />communities concerning partiCipation in the
<br />National Flood Insurance Program (NFIP) and the
<br />wise use of floodplains, in general. Also, provide
<br />assistance to communities to enter the NFIP's
<br />Community Rating System and participate in the
<br />FEMA-funded and CWCB,administered Flood
<br />Mitigation Assistance (FMA) program, which
<br />provides annual funding to develop local flood
<br />hazard mitigation plans and implement flood
<br />mitigation measures,
<br />
<br />g, Respond to state or federal flood disaster
<br />declarations, including preparation of required
<br />post-disaster flood hazard mitigation plans,
<br />
<br />IIII.IIIY lizards
<br />Produce floodplain infonnation .eports
<br />and floodplain delineation studies
<br />
<br />----
<br />
<br />advanced measures, flood fight activities, and
<br />post-flood recovery operations, Activities that
<br />implement program objectives include: 1) chairing
<br />the Colorado Flood Task Force; 2) conducting an
<br />annual spring snowmelt review and' issuing pre-
<br />flood forec.asts, as applicable; 3) pn9paring news
<br />releases; and 4) issuing an annual flood report,
<br />h. Provide general guidance, including preparation of
<br />"Scopes of Services, " to communities
<br />performing floodplain studies or preparing grant
<br />applications for stu,jies,
<br />j, O""rsee and manage floodplain and major
<br />drainage studies, including assistance in
<br />negotiation of profeSSional service contracts,
<br />study management, engineering wor~:, etc,
<br />j, Assist local governments to prepare floodplain
<br />re~llJlations or ordinances or amendments to flood
<br />insurance rate maps.
<br />Ie Perform hydrologic and hydraulic investigations,
<br />I. Assist (technically and financially) in constructing
<br />flood mitigation projects, which will reduce the
<br />e"posure of Colorado citizens and their property
<br />tonood damages,
<br />
<br />-[
<br />
<br />I
<br />
<br />
<br />Dlsigl.ate RlldllBill:]
<br />Review alld approve floodlJlain
<br />infonnation
<br />
<br />
<br />Rls.llld tl Reid EvIIlD
<br />Perform emergency floc,d
<br />response and mitigation
<br />
<br />IBild Prejects ~
<br />Design and construct flood ha;card ...
<br />mitigation and stream rehabilitation
<br />
<br />I 'I '
<br />flOOdplain ManageJl1ent PrOgr m Elementsl
<br />I
<br />"e _,~' >~=" '" "'> ~
<br />
<br />Direct Flderal.Slatl Pr'lrallS
<br />Coordinate CWCB sponsored flood-
<br />related programs
<br />
<br />~
<br />
<br />Devell. Stlndards Y
<br />Establish flood-related techni4:al
<br />standards and guidelines
<br />
<br />Figure 3,1
<br />
<br />,.. ~r
<br />............[
<br />-[
<br />
<br />Assist e.llllunitils ~
<br />Implemenll flood loss reduction
<br />measures in the state's communities
<br />
<br />Prlvldelnl.rllBUln/Educatlen
<br />Administel' Infonnation Support
<br />System and offer public educ:ation
<br />
<br />Chapter 3 - 3
<br />
<br />"'"',' I' n'-"~'''C''!<!'I",;",~,.I,l-ll<'''''~ ,w.i"~':m;,,, ~"",H""""i':.'-'.s~~)\ ~",i_U" ;o'<'mtl--,,,,,':.~q~~- .. >;'.' .>.', ;
<br />-"---------~--------------
<br />
<br />1/2/009:40 PM
<br />
|