My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06506
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:09:11 PM
Creation date
10/5/2006 2:19:47 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Basin
Statewide
Title
Water Project Construction Loan Program Guidelines for Financial Assistance
Date
8/1/1994
Prepared For
State of Colorado
Prepared By
CWCB
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />d. Hydraulic, hydrologic, and structural design criteria for all proposed facilities <br />including: <br /> <br />. Sizing criteria for all hydraulic features such as reservoirs, outlet works, <br />canals, pipelines, pumping plants, etc. with associated energy losses <br />where appropriate. <br /> <br />. Structural design criteria including loadings, stresses, geotechnical <br />considerations, and assumptions used for stability analyses. <br /> <br />. Derivation of the reservoir inflow design flood with volume, peak <br />discharge and routing through the reservoir. <br /> <br />. Spillway sizing for the inflow design flood. <br /> <br />. Site drainage and flood and erosion hazards for all proposed structures. <br /> <br />. Icing, freezing and other cold-weather conditions. <br /> <br />. The number, size and operational characteristics of pumping units in <br />pumping plants. <br /> <br />. Analysis of water hammer in pipelines. <br /> <br />. River diversion requirements during construction. <br /> <br />. Projected impacts of sedimentation on proposed facilities. <br /> <br />e. Land and right-of-way requirements for the proposed project and a tabulation of <br />land ownership at the site of proposed facilities. <br /> <br />f. A detailed project implementation schedule showing the beginning and <br />completion dates for all activities required for project implementation such as <br />planning studies, permits, design, contracts, land and right-of-way acquisition, <br />financing, and construction. <br /> <br />g. A detailed estimate for all costs of project implementation such as planning and <br />permitting activities, engineering design, construction inspection, administrative <br />and legal costs, land and right-of-way acquisition, relocation costs, construction <br />costs, financing costs and an appropriate contingency factor. Detailed <br />construction cost estimates should include a tabulation of: <br /> <br />(1) quantities, unit costs and total costs, or <br /> <br />(2) labor costs, material costs and total costs for each item in the estimate. <br /> <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.