Laserfiche WebLink
<br />2 <br /> <br />The following table is a listing of the existing and modified BFE: <br /> <br />Location <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet)* <br /> <br />Dry Creek/Dry Creek No, 2 Ditch Split Flow: <br />At Burlington Northern Railroad <br /> <br />5,222 <br /> <br />5,220 <br /> <br />*Referenced to the National Geodetic Vertical Datum, rounded to the nearest whole foot <br /> <br />Public notification of the proposed modified BFEs will be given in the Daily Camera on or about <br />November 23 and November 30, 1995, A copy of this notification is enclosed, In addition, a notice of <br />changes will be published in the Federal Re~ister. <br /> <br />Please note that a separate LOMR was issued on the same date as this LOMR to correct the mapping <br />error within the City of Boulder. <br /> <br />Because this LOMR will not be printed and distributed to primary users, such as local insurance agents <br />and mortgage lenders, your community will serve as a repository for these new data, We encourage you <br />to disseminate the information reflected by this LOMR throughout the community, so that interested <br />persons, such as property owners, local insurance agents, and mortgage lenders, may benefit from the <br />information, We also encourage you to prepare a related article for publication in your community's <br />local newspaper, This article should describe the assistance that officials of your community will give <br />to interested persons by providing these data and interpreting the NFIP maps, <br /> <br />The revisions are effective as ofthe date of this letter; however, within 90 days of the second publication <br />in the Daily Camera, a citizen may request that FEMA reconsider the determination made by this LOMR, <br />Any request for reconsideration must be based on scientific or technical data, All interested parties are <br />on notice that, until the 90-day period elapses, the determination to modify the BFEs presented in this <br />LOMn. may itself be modified, <br /> <br />Due to present funding constraints, we must limit the number of physical map revisions processed, <br />Consequently, we will not republish the FIRM and FIS report for your community to reflect the <br />modifications described in this LOMR at this time, However, when changes to FIRM <br />Panel 08013C0415 F and the FIS report for your community warrant a physical revision and republication <br />in the future, we will incorporate the modifications described in this LOMR at that time, <br /> <br />This response to Mr, Mieden's request is based on minimum floodplain management criteria establ:<;hed <br />under the NFIP, Your community is responsible for approving all floodplain development, including this <br />request, and for ensuring that necessary permits required by Federal or State law have been received, <br />With knowledge of local conditions and in the interest of safety, State and community officials may set <br />higher standards for construction, or may limit development in floodplain areas, If the State of Colorado <br />or your community has adopted more restrictive or comprehensive floodplain management criteria, these <br />criteria take precedence, <br /> <br />The map panel as listed above and as revised by this letter will be used for all flood insurance policies <br />and renewals issued for your community, <br />