My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06470
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:09:05 PM
Creation date
10/5/2006 2:18:26 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Weld County
Stream Name
Platte River
Basin
South Platte
Title
Five County Flood Control Commission River Maintenance Program
Date
12/19/1969
Prepared For
Weld County
Prepared By
Eagle Engineering
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3. Cooperative Venture: Completion time = 2 years. <br /> Platte River (contract) = $1,680,000. <br /> Tributaries (County) = 330.534. <br /> Equipment costs (federal) = 609,800. <br /> Maintenance costs (10 yrs.) = 442,800. <br /> Total = $3.063,134. <br /> <br />Conclusion: <br /> <br />1. The program, as outlined, is necessary and feasible. <br /> <br />2. Any method chosen would be financially sound and workable. <br /> <br />3. The plan would fit the outline of the Five County Flood Control <br />Commission and would serve until the Corps of Engineers pro- <br />posals are instituted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.