Laserfiche WebLink
<br />3. Cooperative Venture: Completion time = 2 years. <br /> Platte River (contract) = $1,680,000. <br /> Tributaries (County) = 330.534. <br /> Equipment costs (federal) = 609,800. <br /> Maintenance costs (10 yrs.) = 442,800. <br /> Total = $3.063,134. <br /> <br />Conclusion: <br /> <br />1. The program, as outlined, is necessary and feasible. <br /> <br />2. Any method chosen would be financially sound and workable. <br /> <br />3. The plan would fit the outline of the Five County Flood Control <br />Commission and would serve until the Corps of Engineers pro- <br />posals are instituted. <br />