Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />7. Work Elenent: <br /> <br />Background: <br /> <br />Lead Agency: <br /> <br />Financing: <br /> <br />Schedule: <br /> <br />8. Work Element: <br /> <br />Background : <br /> <br />Lead Agency: <br /> <br />Financing: <br /> <br />Schedule: <br /> <br />9. Work Elenent: <br /> <br />Background: <br /> <br />Lead Agency: <br /> <br />Financing: <br /> <br />Schedule: <br /> <br />Make a study of existing public use facilities, <br />campgrounds and backcountry campsites in Rocky <br />M:Juntain National Park relative to flood ,Hazard. <br /> <br />The more than 200 backcountry campsites, =ss country <br />camping zones, trails, and other park facilities <br />need to be assessed relative to the cx::=ence of <br />catastrophic flood events. <br /> <br />National Park Service with assistance of other <br />agencies <br /> <br />National Park Service <br /> <br />To be acccmplished during the next field season. <br />(May-September of 1983) <br /> <br />Request a Corps of Engineers Section 205 Small <br />Flood Control project study if a flood hazard is <br />identified. <br /> <br />Upon COIlpletion of a revised flood insurance study <br />and provided that a flood problem is clearly shown <br />to exist, Estes Park, at their descretion, could <br />request a Section 205, small flood control project <br />be undertaken by the U.S. Army Corps of Engineers. <br />This study would identify both the non-structural <br />as well as the structural alternatives to the flood- <br />ing problE!lls wi thin Estes Park. <br /> <br />Town of Estes Park <br /> <br />Corps of EngineersjTown of Estes Park <br /> <br />long-term mitigation opportunity <br /> <br />Prepare a handbook for dam owners outlining a simple <br />procedure for mapping the inundation zone below dams. <br /> <br />Mapping of the inundation zone of a dam failure, <br />also known as the catastrophic flOOdplain, can be <br />=nplex or simple, depending on the level of detail <br />needed. A simple procedure has been developed by <br />the Colorado Water Conservation Board which oould <br />be used by dam owners to make a quiCk and inexpensive <br />approximation of the flood boundaries. <br /> <br />Colorado Water Conservation Board;'rhe State Engineer <br /> <br />Under investigation <br /> <br />One year <br /> <br />10 <br />