Laserfiche WebLink
<br />I <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />p <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />. <br /> <br />I <br />I <br />I <br />I <br /> <br />, <br /> <br />I <br />I <br />I <br />I <br /> <br />,- <br /> <br />I <br />I <br /> <br />1-4 <br /> <br />TABLE 1-3 <br /> <br />APPENDIX TO SECTION <br />PHASE A SUMMARY <br /> <br />SUMMARY OF COST BREAKDOWN <br /> <br />The planning assignment was broken down into two parts, The first part (Phase A) <br />was the development of alternative plans, and the second part was prelimi- <br />nary design. An outline of the scope of work included in Phase A is as <br />follows: <br /> <br />ARVADA AND JEFFERSON COUNTY <br />RALSTON AND LEYDEN CREEKS <br />(Dollars) <br /> <br />Description <br /> <br />Traffic <br />Costs <br /> <br />Channe 1 <br />Improvement <br />Costs <br /> <br />Ut i Ii ty <br />Relocation <br />Costs <br /> <br />Property <br />Acquisition <br />Costs <br /> <br />1, Meet periodically with Urban Drainage and Flood Control District, <br />City of Arvada, and Jefferson County representative to insure <br />compliance with the services required by this agreement and to <br />obtain data and general information, <br /> <br />Total <br /> <br />ARVADA <br /> <br />2. Maintain contact and liaison with the U.S, Army Corps of Engineers, <br />the U.S. Geological Survey, the Soil Conservation Service, and other <br />pertinent agencies. <br /> <br />Ralston Creek <br /> <br />$1,860,210 <br /> <br />$7,181,540 <br /> <br />$ 348,070 <br />28,800 <br />$ 376,870 <br /> <br />4. Hydrological studies to determine the characteristics of the 2, 10, <br />and 100-year floods with flood plains shall be prepared for present <br />and future land use conditions along the channel, <br /> <br />$ 9,563,790 <br />304,690 <br />$ 9,868,480 <br /> <br />$ 173,970 <br />7,560 <br />$ 181,530 <br /> <br />Leyden Creek <br /> <br />110,830 <br /> <br />157,500 <br /> <br />), Storm drainage criteria of Urban Drainage and Flood Control District, <br />City of Arvada, Jefferson County, and the State Engineers shall be <br />utilized. <br /> <br />ARVADA TOTAL <br /> <br />$1,971,040 <br /> <br />$7,339,040 <br /> <br />JEFFERSON COUNTY <br />-------- <br />Ralston Creek $1,103,270 $ I ,384,560 $ 27,800 $ 95,800 $ 2,611,430 <br />Leyden Creek 566,460 161,410 -0- 21,000 748,870 <br />JEFFERSON COUNTY <br />TOTAL $1,669,730 $1,545,970 $ 27,800 $ 116,800 $ 3,360,300 <br /> <br />5. The Engineer shall perform the hydraulic calculations in order to <br />define the water surface and flood plains for the various frequencies <br />for future basin conditions, assuming no further development within <br />the flood plain. <br /> <br />6. The Engineer shall define drainage problems, flood hazard problems, <br />and damage estimates, using the hydrology and hydraulics defined in <br />4 and 5 above. The Engineer shall then develop alternate phases on <br />a reach-by-reach basis, which will eliminate, insofar as possible, <br />the drainage and flood hazard problems associated with the basin. <br /> <br />7. Hydraulic calculations shall be made for developing and evaluating <br />the best alternate plans as discussed in 6 above. <br /> <br />RALSTON CREEK $2,963,480 $8,566,100 $ 201,770 $ 443,870 $12,175,220 <br /> 8. The Engineer shall consider presently known Federal Housing and <br />LEYDEN CREEK 677 ,290 318,910 7,560 49,800 1,053,560 Urban Development, Federa 1 Insurance Administration flood insurance <br /> pol icy. <br />PROJECT TOTAL $3,640,770 $8,885,OlD $ 209,330 $ 493,670 $13,228,780 9, Consideration sha 11 be given to the operation and maintenance aspects <br /> of the plans. <br /> 10. Soi I characteristics of the drainage basin shall be taken into consider- <br /> at ion.. <br />