Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />RM 1110-2-2902. Appendix III, 3 Mar 1969 <br /> <br />_ ~Backfill untampe/d~. <br />o/?Tpqw~~ 'o/'\'o/T-rm,A <br /> <br />o p", - _0__ -~- <br /> <br />foundation not <br />t'ormed to fit Shallow earth cushion <br /> <br /> <br />IMPERMISSIBLE PIPE LAYING METHODS FOR DITCHES <br /> <br />c <br />'E <br />~ <br /> <br /> <br />Granular materials, placed and tamped by shovel <br />~-r)7~Q9'"~ <br /> <br />~--O <br /> <br />& l1." ." fl_ of H, <br />Cushion when Hc > 16 ft. <br /> <br /> <br />0.5 be min. <br />Foundation formed to fit <br />for full length of section <br /> <br />ORDINARY PIPE LAYING METHODS FOR DITCHES <br /> <br />~GranUlar materials,carefully placed by hand and <br />thoroughly tamped in loyers not exceeding 6"4 <br />As norrow os ' <br />I" i7"p-o/?--r/,7, practicable o/,-p-o//.I?} ~/,7, <br />bock fill quoli <br /> <br />c <br />'E <br />= <br />~ <br /> <br /> <br />0.6 be min. <br />Foundation formed to fit <br />for full length of section. <br /> <br />c <br />E <br />... <br /> <br /> <br />.5 <br />E <br />CD <br /> <br />He = depth of fill over top of pipe <br /> <br />FIRST CLASS PIPE LAYING METHODS FOR DITCHES <br /> <br />BEDDINGS FOR PIPES <br />DITCH CONDITIONS <br /> <br />PLATE II <br /> <br />I1I-23 <br />