My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06399
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:08:54 PM
Creation date
10/5/2006 2:13:59 AM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Buffalo Creek
Basin
South Platte
Title
Stream Channel Stabilization Techniques for the Buffalo Creek Reclamation Project
Date
8/20/1996
Prepared For
USFWS
Prepared By
Woodward-Clyde
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />EROSION ~ <br /> <br />I <br /> <br />. Cullo~gitudinal channel anchor slotS 4" <br />deep lIDd 4" wide aloag each side of the <br />insmnation to bury edges of matting, <br />whenever possible extend mining 2" - 3" <br />aboveithe crest of ch1lDllel side slopes. <br /> <br />. Begmbg at the downstream end and in the <br />cente~ of the chaDDel, place lI1e initial end <br />of the !msl roll in the anchor trench and <br />secure wilh fastening devices all' <br />intervili. Note: matting will initially be <br />upside dO\Vl1 in anchor trench. <br /> <br />f_ I . . d' lis' <br />. oW same m1lDller, posttion a ~acent ro m <br />anchot trench, overlapping lhe preceding <br />roUIl Jninimum of 3". <br />I <br />. secuJ these initial ends of m81S with <br />ancbots at I ' intervals, bacldiIl and <br />comp&ct soil. <br />! <br />, <br />. Unroll center strip of mat1iag upstream. <br />Stop at next check slot or terminal anchor <br />trenc1l. <br />I <br /> <br />. UmolJ. adjacent malS Upslream in similar <br />fashion, maintaining 3" overlap. <br />I <br />I <br />. Fold and secure an rolls of matting <br />I <br />snugly into an ttansver.;e check <br />slotS. lay mat in the bollom of lhe <br />slot then fold back against ilSelf. <br />Anchor through both layers of mat <br />at I' intervals then backfill and <br />c:ompW: soil. Continue rolling an <br />mat widths upstream to the next <br />check slot or tenlIinal anchor <br />!rencll. <br />I <br /> <br />. AJ,temate method for noncritical <br />jn_nations: place two rows of anchors on <br />6" centers at 25' - 30' intervals in lieu of <br />excavared chec:k slots. <br />I <br />I <br /> <br />. Shingle-lap spIic:ed ends by a minimum of l' <br />wilh uPstream mal on top 10 prevent <br /> <br />uplifting by water or begin new rolls in a <br />i:heck: slot. Anchor overlapped area by <br />p1acing rwo rows of anchors, l' apart on l' <br />intervals. ' <br /> <br />. <br /> <br />Place edges of outside mats in previously <br />excavated longitudinal slots, anchor using <br />presc:ribed staple pinero, backfill and <br />compact soil. <br /> <br />. Anchor, fill and compact upstream end of . <br />mal in a 12" x 6" tenDinal trench. <br /> <br />. <br /> <br />Seaue mat to ground surlace using U- <br />shaped wiR staples geotexlile pins or <br />wooden stakes. <br /> <br />. <br /> <br />Seed and fillllllf reinforcement matting with <br />soil, if specifipd <br /> <br />Soil rolinI' if specified for lIIlf reinforcement. <br /> <br />. AfteT seeding, spread and lightly rake 1/2" - <br />3/4" of fille topsoil into the mat apertures to <br />completely fill mat thickness. Use backside <br />of rake or other flat implement. <br /> <br />. Spread topsoil using lightweight loader, <br />backhoe, or other power equipment. Avoid <br />slwp lIIms wilh equipment <br /> <br />. Do not drive IrackecI or heavy eqllipm..m <br />over mat. <br /> <br />. <br /> <br />Avoid any ttaffic over matting if loose or <br />wet soil conditions exist. <br /> <br />. <br /> <br />Use shovels. rakes or brooms for fine <br />grading and touch up. <br /> <br />. Smooth out soil filliIIg just exposing top <br />DCning of matrix. <br />
The URL can be used to link to this page
Your browser does not support the video tag.