Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e <br /> <br />DRAINAGE CRITERIA MANUAL (V. 2) <br /> <br />TABLE OF CONTENTS <br /> <br />4.2 <br /> <br />Potential Sources of Financial Assistance at Federal, State, and <br />Local Levels........ .......................,............................... .............. .......................... ..., .... FP-23 <br /> <br />5.0 REFERENCES. ................................................................................................. ......... ..... ........ FP-26 <br /> <br />Revegetation <br /> <br />1.0 INTRODUCTION.............. ............... ...................................................................... .................... RV-1 <br /> <br />2.0 SCOPE OF THIS CHAPTER AND RELATION TO OTHER RELEVANT <br /> <br />DOCUMENTS................... ....................................................................... ............... ....,. ,.... ........ RV-2 <br /> <br />3.0 GENERAL GUIDELINES FOR REVEGETATION .....................................................................RV-3 <br /> <br />3.1 Plant Materials .............................................................................................................. RV-3 <br />3.2 Site Preparation..... ............ ................... ...,................................... ...... .......... .......... ....... RV-3 <br />3.3 Seeding and Planting ....,............................................................................................... RV-4 <br />3.4 Maintenance................................................ ........................ ........... ............................... RV-4 <br /> <br />4.0 <br /> <br />PREPARATION OF A PLANTING PLAN .................................................................................. RV-6 <br /> <br />4.1 General...................... ....................................... ................. ......... .............................. ..... RV-6 <br />4.2 Soil Amendments.................................................................. ...... .................................. RV-6 <br />4.2.1 Humate Conditioner ......................,.................................................................. RV-7 <br /> <br />4.2.2 Blosol .............. ................... ............................................. ................................. RV-7 <br />4.3 Recommended Seed Mixes........................... ..... .......... ..................... ................... ........ RV-7 <br />4.4 Trees, Shrubs and Wetland Plantings ........................................................................RV-12 <br /> <br />4.5 Mulching........................ ......... ...... ......... .............. ........................,............................... RV -14 <br />4.6 Bioengineering......... .... .......... ...... ............................................,................... .... ...... ..... RV-15 <br />4.7 Collection of Live Stakes, Willow Cuttings, and Poles................................................ RV-15 <br />4.7.1 Harvest Procedure ......................................................................................... RV-16 <br /> <br />4.7.2 Installation .................................,............................. ................ ....................... RV-17 <br /> <br />5.0 POST-CONSTRUCTION MONITORING... ................... ................ .... ....................................... RV-25 <br /> <br />6.0 REFERENCES ......................... .................................. .......................................... ... ......... ........ RV-26 <br /> <br />Design Examples <br /> <br />1 .0 INTRODUCTION........................................... .............................. ......................... .... ..... .... ......... DE-1 <br /> <br />2.0 <br /> <br />CASE STUDY-STAPLETON REDEVELOPMENT........... .... ......... ...... ......................., ............ DE-2 <br /> <br />2.1 Project Setting...... .................... ......................................... ... ......................... .......... ...... DE-2 <br />2.2 Project Objectives.......... ................ ............................................ .... ............................... DE-2 <br />2.3 Hydrologic Evaluation For Detention Pond Sizing ........................................................ DE-5 <br />2.3.1 CUHP and UDSWM ......................................................................................... DE-5 <br />2.3.2 Rational Method Hydrology..... ..... ............................ ........... ..... ......... ..... ..... ..... DE-7 <br /> <br />2.3.3 FAA Method ................................................................................................... DE-1 0 <br />2.3.4 Denver Regression Equation ........... .............................................................. DE-1 0 <br />2.3.5 Comparison of the Sizing Methodologies ...................................................... DE-13 <br />2.4 Detention Pond Outlet Configuration .......................................................................... DE-13 <br />2.4.1 Stage-Storage Relationships ......................................................................... DE-15 <br />2.4.2 Water Quality Volume Requirements............................................................. DE-15 <br />2.4.3 Final Pond Outlet Configuration ..................................................................... DE-15 <br />2.5 Hydraulic Analysis And Capacity Verification Of The Existing Outfall........................ DE-24 <br />2.6 Local Storm Sewer Design .........................................................................................DE-27 <br />2.6.1 Determination of Allowable Street Capacity ..................................................DE-28 <br />2.6.2 Determination of Inlet Hydrology....................................................................DE-28 <br /> <br />6/2001 <br />Urban Drainage and Flood Control District <br /> <br />TOC-vii <br />