My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06380
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:08:49 PM
Creation date
10/5/2006 2:12:48 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Adams/Arapahoe/Denver/Broomfield/Douglas/Jeffco
Basin
Statewide
Title
Urban Storm Drainage, Criteria Manual Volume 2
Date
6/1/2001
Prepared By
Wright Water Engineers, Inc.
Floodplain - Doc Type
Educational/Technical/Reference Information
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />DRAINAGE CRITERIA MANUAL (V. 2) <br /> <br />HYDRAULIC STRUCTURES <br /> <br />channel. Baffle chute drops are best suited for grass-lined channels and should not be used for boatable <br />streams. <br /> <br />The basic design criteria and details are given In Figure HS-11 (adapted from Peterka 1984). Remaining <br />structural design parameters must be determined for specific site conditions. Recommended design <br />procedures are as follows: <br /> <br />1. Determine the maximum inflow rate and the design unit discharge, q = g . <br />W <br /> <br />2. An upstream channel transition section with vertical wingwalls constructed 45 degrees to the flow <br />direction causes flow approaching the rectangular chute section to contract. It is also feasible to <br />use walls constructed at 90 degrees to the flow direction. In either configuration, it is important to <br />analyze the approach hydraulics and water surface profile. Often, the effective flow width at the <br />criticai cross section is narrower than the width of the chute opening due to flow separation at the <br />corners of the abutment (see Section 5.0). <br /> <br />3. The entrance transition should be followed by a rectangular flow alignment apron, typically 5 feet <br />in length. The upstream approach channel velocity, V, should be as low as practical and less <br />than critical velocity at the control section of the crest. Figure HS-11 b gives the USBR- <br />recommended chute entrance velocity. In a typical grass-lined channel, the entrance transition to <br />the rectangular chute section will produce the desired upstream channel velocity reduction. The <br />chute elevation (shown in Figure HS-11b) should only be above the channel elevation when <br />approach velocities cannot be controlled by the transition. Extra measures to prevent upstream <br />aggradation are required with the raised crest configuration. <br /> <br />4. Normally, the baffles should be sized at height, H, equal to 0.8 times critical depth at peak flow. <br />The chute face slope should be 2:1 for most cases but may be reduced for low drops or where a <br />flatter slope is desirable. For unit discharge applications greater than 60 cfs/ft, the baffle height <br />may be based on two-thirds of the peak flow; however, the chute sidewalls should be designed <br />for peak flow (see Step 8 below). <br /> <br />Baffle block widths and spaces should equal approximately l.5H but not less than H. Other baffle <br />block dimensions are not critical hydraulically. The spacing between the rows of baffle block <br />should be H times the slope ratio. For example, a 2:1 slope makes the row spacing equal to 2H <br />parallel to the chute floor. The baffle blocks should be constructed with the upstream face normal <br />to the chute floor. <br /> <br />5. Four rows of baffle blocks are required to establish full control of the flow. At least 1 Y. rows of <br />baffles should be buried in riprap where the chute extends below the downstream channel grade. <br /> <br />06/2001 <br />Urban Drainage & Flood Control District <br /> <br />HS-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.