Laserfiche WebLink
<br />HYDRAULIC STRUCTURES <br /> <br />DRAINAGE CRITERIA MANUAL (V. 2) <br /> <br />2. For drops of 5 feet or less in height, use the UD-Channels Spreadsheet to determine the 100- <br /> <br />year critical velocities in the low-flow channel and the main channel to size boulders for each <br /> <br />section. <br /> <br />e <br /> <br />3. For drops greater than 5 feet in height, determine the critical velocities using drawdown <br />calculations to establish the 100-year flow depth at the toe of the drop. <br /> <br />4. For a composite channel, find critical velocity, V" for the channel cross-section segment outside <br />the low-flow section. <br /> <br />5. For a composite channel, find critical velocity, Vm" for the low-flow channel cross-section <br />segment. <br /> <br />6. For a simple trapezoidal or wetland bottom channel, find critical velocity, V" for the channel cross <br />section. <br /> <br />7. Calculate rock-sizing parameter, Rp, for the channel cross-section segment outside the low-flow <br /> <br />section or for a simple trapezoidal channel section using the critical velocity estimated for this <br /> <br />segment of the cross section: <br /> <br />Rp <br /> <br />V SO.17 <br />, <br />(S, _1)"66 <br /> <br />e <br /> <br />in which: <br /> <br />S = iongitudinal slope along direction of flow in fl/ft <br /> <br />S, = Specific gravity of the rock. Assume 2.55 unless the quarry certifies higher specific <br />gravity. <br /> <br />8. Calculate rock-sizing parameter, RpL' for the channel cross-section segment within the low-flow <br />section using the critical velocity estimated for this segment of the cross section: <br /> <br />V SO.17 <br />R - me <br />pL (S, _1)066 <br /> <br />(HS-9) <br /> <br />g. Select minimum boulder sizes for the segments within and outside the low-flow channel segment <br />of the channel cross section from Table HS-5. If the boulder sizes that result for the iow-f1ow <br />channel and the overbank segments of the cross section differ, decide to use only the larger <br />sized boulders throughout the entire structure, or to specify two sizes, namely, one for the low- <br />flow channel and the other for the overbank segments of the cross section. Consider the <br /> <br />e <br /> <br />HS-24 <br /> <br />06/2001 <br />Urban Drainage & Flood Control District <br />