My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06380
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:08:49 PM
Creation date
10/5/2006 2:12:48 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Adams/Arapahoe/Denver/Broomfield/Douglas/Jeffco
Basin
Statewide
Title
Urban Storm Drainage, Criteria Manual Volume 2
Date
6/1/2001
Prepared By
Wright Water Engineers, Inc.
Floodplain - Doc Type
Educational/Technical/Reference Information
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />HYDRAULIC STRUCTURES <br /> <br />DRAINAGE CRITERIA MANUAL (V. 2) <br /> <br />HS-7 Lane's Weighted Creep: Recommended Ratios.....................................................................HS-34 <br /> <br />HS-8 General Cutoff Technique Suitability ...........,........................................................................... HS-35 <br /> <br />HS-9 Median (i.e., Dso) Size of District's Rlprap................................................................................HS-68 <br /> <br />HS-10 Subcritical Transition Energy Loss Coefficients....................................................................... HS-91 <br /> <br />Figures <br /> <br />HS-1 Probable Range of Drop Choices and Heights ........................................................................ HS-42 <br /> <br />HS-2a Hydraulic Analysis-Section at Crest of Drop.......................................................................... HS-43 <br /> <br />HS-2b Hydraulic Analysis-Profile for Sloping Drop........................................................................... HS-43 <br /> <br />HS-3 Typical Forces at Work in Grouted Sloping Boulder Structures .............................................. HS-44 <br /> <br />HS-4 Coefficient of Pressure Fluctuation, Cpo at a Hydraulic Jump .................................................. HS-45 <br /> <br />HS-5 Pressure Fluctuation Coefficient, Cp, Normalized for Consideration of Slope <br />and Jump Beginning on Slope ................................................................................................. HS-45 <br /> <br />HS-6 Coefficient of Pressure Fluctuation, Cp, in a Jump on a USBR II or III Basin ..........................HS-46 <br /> <br />HS-7a1 Grouted Sloping Boulder Drop With Trickle Channel ..............................................................HS-47 <br /> <br />HS-7a2 Grouted Sloping Boulder Drop With Trickle Channel ..............................................................HS-48 <br /> <br />HS-7a3 Grouted Sloping Boulder Drop With Trickle Channel ..............................................................HS-49 <br /> <br />HS-7a4 Grouted Sloping Boulder Drop With Trickle Channel ..............................................................HS-50 <br /> <br />HS-7b1 Grouted Sloping Boulder Drop With Low-Flow Channel..........................................................HS-51 <br /> <br />HS-7b2 Grouted Sloping Boulder Drop With Low-Flow Channel..........................................................HS-52 <br /> <br />HS-7b3 Grouted Sloping Boulder Drop With Low-Flow Channel..........................................................HS-53 <br /> <br />HS-7b4 Grouted Sloping Boulder Drop With Low-Flow Channel..........................................................HS-54 <br /> <br />HS-8 Grouted Sloping Boulder Drop With Low-Fiow Channel.......................................................... HS-55 <br /> <br />HS-9 Vertical Hard Basin Drop.......................................................................................................... HS-56 <br /> <br />HS-10 Vertical Drop Hydraulic System ............................................................................................... HS-57 <br /> <br />HS-11 Baffle Chute Drop Standard USBR Entrance .......................................................................... HS-58 <br /> <br />HS-12 Baffle Chute Crest Modifications and Forces........................................................................... HS-59 <br /> <br />HS-iv <br /> <br />06/2001 <br />Urban Drainage & Flood Control District <br /> <br />e <br /> <br />e <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.