Laserfiche WebLink
<br />r <br />. <br /> <br />CWCB Construction Loan Fund <br /> <br />Agency: Colomdo Water Conservation Board <br />(CWCB) <br /> <br />. <br /> <br />Purpose: The Construction Loan Fund consists of <br />monies previously set aside by the General <br />Assembly and made available for water project <br />planning and construction. Flood mitigation <br />funding is set at 5%' of the Loan Fund annual <br />revenues. Projects involving expansion or planning <br />that incorporate mitigation costs may not involve <br />the 5% funding set aside solely for mitigation. <br />This includes the construction of new dams or <br />enlargement of existing dams, rehabilitation of <br />existing dams to meet safety standards, and <br />rehabilitation of agricultural water supplies or <br />municipal raw water supply systems. <br /> <br />Form of assistance: Low Interest loans, previous <br />amounts range from $34K to $IM. <br /> <br />Application: Direct to CWCB; deadline is August <br />31. <br /> <br />Match requirements: None indicated. <br /> <br />Contact: Colomdo Water Conservation Board <br />. 1313 Sherman St., Rm. 721 <br />Denver, CO 80203 <br />303-866-3441 <br />