My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06302
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD06302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:08:33 PM
Creation date
10/5/2006 2:10:17 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Sterling
Stream Name
Pioneer Drainage Ditch
Basin
South Platte
Title
Proposed Near-term Improvements and Operation of Pioneer Drainage Ditch
Date
7/1/1988
Prepared For
Sterling
Prepared By
Charles F. Leaf, PE
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />:1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />17 <br /> <br />.:~ <br /> <br />Channel Storage <br /> <br />Channel storage upstream from the impoundment structure is approximately <br />25 acre-feet at elevation 3925.5 ft. Water depths at several locations <br />upstream are as follows: <br />Locati on Depth (ft.) <br />North Division Avenue (Node 4) 10 <br />North 7th Avenue B ri dge 7 <br />Franklin St. Bridge (Node 3) 4 <br />It is emphasized that the impoundment structure should be operated in a <br />manner that minimizes seepage problems. Because the Pioneer Ditch is <br />also a drain, storage times after every storm event should be as short as <br />possible. Accoun,tlilg for channel storage, net storage volume in the <br />impoundment structure should be 160 and 190 acre-feet for existing conditions <br />and future development, respectively. <br /> <br />Design Criteria For Near~Term Improvements <br /> <br />Design parameters for near-term improvements are summarized below. <br />All bottlenecks upstream from the proposed impoundment structure <br />should be removed. Upgraded crossings should be designed to <br />convey the peak flows summarized in Table 4. Design of 10-year <br />peak flows at all crossings should be computed from Figure 3 using <br />a peak flow adjustment factor of 1.5 for developed areas upstream <br />from each crossing (see example calculations for Node 2). <br />The storage capacity of the proposed impoundment structure at <br />Node 4 should be approximately 190 acre-feet. <br />Maximum water surface elevation of the storage pool from a 10-year, <br />6 hour runoff event should be 3,925.5 ft. m.s.1. The maximum rate <br />of outflow should not exceed 620 c.f.s. The structure should be <br />proportioned s,o that desi gn outf1.ow rate and maximum storage occur <br />at the same stage (3,925.5 ft.). Maximum water surface elevation <br />in the Pioneer Ditch immediately downstream from the spillway <br />should not exceed 3,922.5 ft. m.s.1. <br />All near-term improvements Shou1 d be designed so that they sustain <br />minimal damage from a regional 100-year flood event. <br />
The URL can be used to link to this page
Your browser does not support the video tag.