Laserfiche WebLink
<br />I <br />I <br />I <br />:1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />13 <br /> <br />Assumptions <br /> <br />The purpose of dentention storage at Node 4 is to reduce peak <br />discharges in the reach between Nodes 4 and 5 to levels which will not <br />produce local backwater flooding. In designing the impoundment, it <br />was assumed that the structure would be located so that existing and <br />proposed future outfalls from Service Areas 6,7. and 8 (Figure 5) discharge <br />into the Ditch downstream from the spillway. (The reader is referred to <br />Leaf and ReI. 1983 for a complete discussion of proposed improvements in <br />the Master Drainage Plan). A summary of inflows from these Service Areas <br />under future development is shown in Table 6. The 640 c.f.s. is less than <br />the existing Ditch capacity summarized in Table 4. The water surface <br />elevation in the vicinity of N. Sydney Avenue at a Ditch flow of 640 c.f.s. <br />would be 3,922.7 feet m.s.l. It was also, assumed that the peak flows <br />summarized in Table 6 will occur prior to the occurrence of spills from <br />dentention storage due to shorter times of concentration. Thus peak <br />outflows from the impoundment structure would be into an essentially empty <br />channel downstream. <br /> <br />Inflow Hydrographs <br /> <br />Table 7 summarizes ten-year. six hour inflow hydrographs for existing <br />conditions and assumed future development. <br />It is assumed that the storage structure is proportioned so that the <br />maximum outflow rate and maximum storage occur at the same stage. As seen <br />in Table 7. storage capacity for an outflow of 620 c.f.s. is 185 and 215 <br />acre-feet for existing conditions and future development respectively. <br />These are conservative estimates since they do not take into <br />cons iderati on the vol ume removed from storage by the outflow devi ces. The <br />spillway crest elevation should be set so that the time period during <br />which the reservoir fills to the spillway crest is adequate to allow storm <br />runoff peaks entering the channel downstream to flow to the river. The <br />maximum water surface elevation of the storage pool is 3,925.5 m.s.1. which <br />is 10 feet above the flow line of the Pioneer Ditch. <br />