Laserfiche WebLink
<br />. <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />DRAINAGE FACILITIES <br />CITY OF YUMA, COLORADO <br />PRELIMINARY COST ESTIMATE <br />AIRPORT SOUTH <br /> <br />Item Estimate Unit <br />No. Description Quantity Unit Cost Total Cost <br />I. Open Ditch 2,100 L.F. 1.10 2, 310. 00 <br />2. Ditch Checks 3 ea. 500.00 I, 500. 00 <br />3. Rip Rap. 100 S.Y. 2.00 200.00 <br />4. Total Construction Cost 4,010.00 <br />5. 200/0 Legal, Engineering <br /> & Contingencies 800.00 <br />6. Land & Right-of-way O. 7 AC 2,000.00 1,400. 00 <br />7. Total Project Cost 6,210.00 <br /> <br />36 <br />