Laserfiche WebLink
<br />I <br />I <br />I DRAINAGE FACILITIES <br /> CITY OF YUMA, COLORADO <br />I PRELIMINARY COST ESTIMATE <br />I LEGION & PHEASANT RIDGE AREA <br />I Item Estimate Unit <br />No. Desc ription Quantity Unit Cost Total Cost <br />I l. 15" R. C. P. 250 L.F. t5.00 3,750.00 <br />I 2. 18" R. C. P. 800 L. F. 17.00 13,600.00 <br />I 3. 30" R. C. P. 130 L.F. 23.00 2,990.00 <br />4. 36" R. C. P. 2,430 L. F. 27.00 65,610.00 <br />I 5. Re-1ocate Water Lines 7 ea. 300.00 2,100. 00 <br />I 6. Inlet Structures 10 ea. 900.00 9,000.00 <br />I 7. Manholes 4 ea. 700.00 2,800.00 <br /> 8. Pond Excavation <br />I (a) Legion - 0 <br /> (b) Pheasant Ridge 5 A.F. 1,129.00 5,645.00 <br />I Total 5 <br />I 9. 8th Avenue Ditch 3,020 L.F. l. 50 4,530.00 <br /> 10. Pond Outlet Str. 3 ea. 1, 200. 00 3,600.00 <br />I ll. 2" A. C. Patching 2,418 S.Y. 2.50 6,045.00 <br />I 12. Rip Rap. 400 S.Y. 2.00 800.00 <br />I 13. Improve Exist. Ditch Cross. 5 ea. 650.00 3,250.00 <br /> 14. Total Construction Cost 123,720.00 <br />I 15. 200/. Legal Eng. & Cont. 24,700.00 <br />I 16. Land & Right-of-way 1 acre 2,000.00 2,000.00 <br />I 17. Total Project Cost 150,420.00 <br /> 33 <br />I <br />