Laserfiche WebLink
<br />. <br />I <br />I DRAINAGE FACILITIES <br />I CITY OF YUMA, COLORADO <br /> PRELIMINARY COST ESTIMATE <br />I NORTH YUMA - R. R. POND <br />I Item Estimate Unit <br />I No. Description Quantity Unit Cost Total Cost <br /> 1. 15" R. C. P. 200 L.F. 15.00 3,000.00 <br />I 2. 30" R. C. P. 650 L.F. 23.00 14,950.00 <br />I 3. 33" R. C. P. 400 L.F. 25.00 10,000.00 <br />I 4. 36" R. c. P. 250 L.F. 27.00 6,750.00 <br /> 5. 42" R. C. P. 1,200 L. F. 30.00 36,000.00 <br />I 6. Ditch East 1,400 L.F. 5.00 7,000.00 <br />I 7. Pond Excavation 28 A.F. 1,129.00 31,612. 00 <br />I 8. Re-1ocate Water Lines 5 ea. 300.00 1,500. 00 <br /> 9. Inlet Str. 10 ea. 900.00 9,000.00 <br />I 10. Lake Outlet Str. 2 ea. 1,200. 00 2,400.00 <br />I 11. 2" A.C. Pa tching 1,800 S.Y. 2.50 4, 500. 0'0 <br />I 12. Rip Rap. 200 S.Y. 2.00 400.00 <br /> 13. Manholes 5 ea. 700.00 3,500.00 <br />I 14. Total Construction Cost \ 130,612.00 <br />I 15. 20% Legal Engineering & <br /> Contingencies 26,125.00 <br />I 16. Land & Right-of-way 54,000.00 <br />I 17. Total Project Cost 210,737.00 <br />I 30 <br />I <br />