My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06286
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD06286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:08:30 PM
Creation date
10/5/2006 2:09:24 AM
Metadata
Fields
Template:
Floodplain Documents
County
Yuma
Community
Yuma
Stream Name
Republican River
Basin
Republican
Title
Master Plan of Drainage Facilities Yuma
Date
10/1/1975
Prepared For
Yuma
Prepared By
Parker & Associates
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />the development would collect storm flow from the e~isting <br /> <br />railroad culvert and overland flow area west of the develoEment. <br />- . - - -.::.:..-- "- - - -- -- - ~- <br /> <br />The proposed 36" culvert across the county road would eliminate <br /> <br />ponding areas west of the county road, carrying the drainage to <br />~. . <br /> <br />the pond. (Indian Hills II). The capacity of the proposed pond <br /> <br />is 12.1 acre feet. A 30" outlet .is proposed from Indian Hills <br /> <br />Pond II to the intersection of North Juniper and Apache Drive. <br /> <br />A combination pond drain and storm sewer would then be con- <br />~--;-- - --- <br /> <br />structed north along Juniper to the back lot lines between <br /> <br />Navajo and Apache Drive, thence east along the back lot lines <br /> <br />to the line between lots 44 &: 45. The 30" line would then be <br /> <br />constructed north to Navajo Drive, thence east ,!-long Navajo <br /> <br />Drive to the end of the street as plotted. It is then proposed <br /> <br />to construct a 30" line north along the east line of the develop- <br /> <br />ment to the proposed pond (Indian Hills No. I). At the east end <br /> <br />of the Sioux Drive. The capacity needed for the proposed Indian <br /> <br />Hills Pond No. I is approximately 15 acre feet. A 24" outlet <br /> <br />structure is proposed to drain the No. I Pond. The 24" line <br /> <br />would daylight into the natural drainage way_northe~ of the <br /> <br />development. Provisions are made in the cost estimate for <br /> <br />easement across th~ private property northeast of the development. <br /> <br />The capacity of the 24" line would minimize flows into the farm- <br /> <br />land causing a minimal amount of crop damage. It should be <br /> <br />18 <br /> <br />\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.