Laserfiche WebLink
<br /> <br />CONSULTANTS, INC. <br /> <br />July 11, 1973 <br /> <br />Mr. L. Scott Tucker, <br />Executive Director <br />Urban Drainage and <br />Flood Control District <br />181 East 56th Avenue <br />Denver, Colorada 80216 <br /> <br />Our File: <br /> <br />1132/4 <br />DG 855/73 <br /> <br />Subject: <br /> <br />Niver Creek <br />Phase A <br /> <br />Dear two Tucker: <br /> <br />We have completed the Phase A work on the Niver Creek study; the results are <br />given in the enclosed report and are summarized in this letter. <br /> <br />- <br />. <br /> <br />The purpose of this study is to: <br /> <br />1. Define the rainfall and runoff in the <br />Niver Creek Basin. <br /> <br />2. Estimate the flooding and damages <br />caused by that runoff. <br /> <br />3. Conceive alternative ways to reduce <br />or eliminate these damages and esti- <br />mate their cost. <br /> <br />4. Analyze the technical, economic, social <br />and legal consequences of each alterna- <br />tive, and co~are and present the results. <br /> <br />- <br />. <br /> <br />A PLANNING RESEARCH CORPORATION COMPANY <br />