Laserfiche WebLink
<br />3 <br /> <br />of the effective FIRM to which the regulations apply and the modifications described in this LOMR, <br />Our records show that your community has met this requirement. <br /> <br />A Consultation Coordination Officer (CCO) has been designated to assist your community. The CCO <br />will be the primary liaison between your community and FEMA. For information regarding your CCO, <br />please contact: <br /> <br />Mr. Steve L. Olsen <br />Director, Mitigation Division <br />Federal Emergency Management Agency, Region VIII <br />Denver Federal Center, Building 710, Box 25267 <br />Denver, CO 80225-0267 <br />(303) 235-4830 <br /> <br />FEMA makes flood insurance available in participating communities; in addition, we encourage <br />communities to develop their own loss reduction and prevention programs. Through the Project <br />Impact: Building Disaster Resistant Communities initiative, launched by FEMA Director James Lee <br />Witt in 1997, we seek to focus the energy of businesses, citizens, and communities in the United States <br />on the importance of reducing their susceptibility to the impact of all natural disasters, including floods, <br />hurricanes, severe storms, earthquakes, and wildfires. Natural hazard mitigation is most effective when <br />it is planned for and implemented at the local level, by the entities who are most knowledgeable of local <br />conditions and whose economic stability and safety are at stake. For your information, we are enclosing <br />a copy of a pamphlet describing this nationwide initiative. For additional information on Project Impact, <br />please visit our website at www,fema,l!ov/imDact, <br /> <br />If you have any questions regarding floodplain management regulations for your community or the NFIP <br />in general, please call the CCO for your community at the telephone number cited above, If you have <br />any questions regarding this LOMR, please call our Map Assistance Center, toll free, at <br />l-877-FEMA MAP (1-877-336-2627). <br /> <br />Sincerely, <br /> <br />~P~F <br /> <br />Sally p, Magee, Project Engineer <br />Hazards Study Branch <br />Mitigation Directorate <br /> <br />For: <br /> <br />Matthew B. Miller, P,E., Chief <br />Hazards Study Branch <br />Mitigation Directorate <br /> <br />Enclosures <br /> <br />cc: Mr, David Hollingsworth, P.E. <br />Storm Drainage Engineer <br />Department of Community Development <br />City ofLongmont <br /> <br />Mr, Mark A. Severin, P,E, <br />Water Resources Engineer <br />Rocky Mountain Consultants, Inc, <br />