Laserfiche WebLink
<br />Section 831. Great Egg Harbor, Corson, and Townsend Inlets, NJ <br /> <br />Authorizes Secretary, if recolllllended in a Chief's report, to separately <br />construct beach erosion control, storm protection, or navigation feature of <br />Great Egg Harbor, Corson, and Townsend Inlets Projects. <br /> <br />Section 832. Apalachicola - Chattahoochee - Flint Rivers, GA & FL <br /> <br />Directs Secretary to restore and maintain access to bendways and <br />interconnecting waterways, and to acquire, construct and operate water-related <br />public use and access facilities on the Apalachicola River, unless unfavorably <br />reviewed by the Secretary. <br /> <br />Section 833. Milk River, Havre, Montana <br /> <br />Authorizes reconstruction or replacement of the water intake weir at Havre, <br />unless unfavorably reviewed by the Secretary. <br /> <br />Section 834. Curwensville Lake, PA <br /> <br />" <br /> <br />Authorizes construction of water supply line to Bloomington. <br /> <br />Section 835. Waterloo, Iowa <br /> <br />Provides for reconstruction of the Highway 20 and Lafayette St. Bridges. <br /> <br />Section 836. Mud Lake, Western Tennessee !ribs <br /> <br />Changes local cooperation requirements for the Mud Lake feature. <br /> <br />Section 837. Kawkawlin River, MI <br /> <br />Provides that the Federal share of O&M is 50 percent. <br /> <br />Section 838. Denison Dam (Lake Texoma), Red River, TX & OK <br /> <br />Authorizes reallocation of hydropower storage to water supply storage, <br /> <br />Section 839. Buffalo Ship Canal, Buffalo, NY <br /> <br />Authorizes construction of a highlift span bridge over the ship channel <br />unless unfavorably reviewed by the Secretary within 3 years. <br /> <br />Section 840. Jackson Hole Snake River, WY <br /> <br />Provides that project O&M is a Federal responsibility provided that non- <br />Feds provide the initial $35,000 in cash. <br /> <br />25 <br />