My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06200
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD06200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:08:14 PM
Creation date
10/5/2006 2:06:07 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Water Resources Development Act of 1986 - Federal
Date
11/7/1988
Prepared For
Water Resources Development Act of 1986
Floodplain - Doc Type
Educational/Technical/Reference Information
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Section 733. Lake Okeechobee Study <br /> <br />Authorizes the Secretary, in consultation with the EPA, to study the water <br />supply potential of Lake Okeeehobee with emphasis on determining the causes of <br />water quality deterioration in the Lake and the impact of the Central and <br />Southern Flor ida Irrigation Project on water quality in the Lake. <br /> <br />TITLE VIII PROJECT MODIFICATIONS <br /> <br />Section 801. Lynnhaven Inlet, VA <br /> <br />Virginia Beach remedial work. <br /> <br />Section 802. Elizabeth River, VA <br /> <br />Deletes requirement for cash contribution for land enhancement. <br /> <br />Section 803. Massillon, Ohio Bridge <br /> <br />Modifies Ohio River Basin nood control plan by authorizing Masslllon <br />bridges reconstruction. <br /> <br />Section 804. Mamaroneck Harbor, NY <br /> <br />~ <br /> <br />Provides ocean disposal cost sharing. <br /> <br />Section 805. Lake Pontchartrain, LA <br /> <br />Provides for construction of Jefferson Parish noodwall, unless unfavorably <br />reviewed by the Secretary. <br /> <br />Section 806. Reel foot Lake, ICY <br /> <br />Provides for Federal share of pumping plant operations to be 50 percent, <br /> <br />Section 807. Yaquina Bay and Harbor, OR <br /> <br />Authorizes Secretary to raise south jetty, unless unfavorably reviewed by <br />the Secretary within 3 years. <br /> <br />Section 808. South Platte River BaSin, CO <br /> <br />Authorizes reallocation of Chatfield Lake Storage. <br />Section 809. King Harbor, Redondo Beach, CA <br /> <br />Modifies the King Harbor project in order to carry out maintenance dredging <br />and for breakwater construction. <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.