My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06127
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD06127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:07:57 PM
Creation date
10/5/2006 2:01:14 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
Horsetooth Dams and Resivour
Basin
South Platte
Title
Emergency Preparedness Plan Brief
Date
10/1/1983
Prepared For
State of Colorado
Prepared By
USDOI/BOR
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COMMUNICATIONS SUMMARY SHEET <br /> <br />The dam operator must be knowledgeable in recognizing an emergency <br />situation or unusual condition and must act immediately to minimize <br />danger--to the structure and to all persons within the immediate area, <br />especially in the downstream channel. The reporting sequence used in <br />reporting an emergency at the structure is as follows: <br /> <br />Dam Operator or Sudden Dam Failure Larimer County Sheriff <br />Observer When commun'cat'ons Weld County Sheriff <br />Conservancy between the dam Morgan County Sheriff <br />Oistrict operator or obser- <br />Personnel ver and the con- <br /> trol center or <br /> project office is <br /> lost. <br />Loveland Control Center <br />Conservancy District <br /> Larimer County Sheriff <br />Project Manager As needed Weld County Sheriff <br /> Morgan County Sheriff <br /> Federal Agencies <br /> State Agencies <br />Regional Office <br /> I <br />Engineering and Cornniss ioner I 5 <br />Research Center Office <br /> <br />NOTE TO ALL INOIVIOUALS INVOLVEO IN EMERGENCY REPORTING: Decisions <br />which must be made at each step of the communications network are <br />whether the emergency requires immediate action and who should determine <br />the action. The highest ranking individual in the communications net- <br />work at anyone time has the responsibility to make these decisions. <br /> <br />A dairy (tape recording, if possible) of all decisions made and actions <br />taken shall be kept by each reporting level. <br />
The URL can be used to link to this page
Your browser does not support the video tag.