<br />pIetion of the Work. these record documents, samples and
<br />Shop Drawings will be delivered to ENGINEER for OWNER.
<br />
<br />Safety and Protection:
<br />
<br />6.20. CONTRACTOR shall be responsible for initiating,
<br />maintaining and supervising all safety precautions and pro~
<br />grams in connection with the Work. CONTRACTOR shall
<br />take all necessary precautions for the safety of. and shall
<br />provide the necessary protection to prevent damage, injury
<br />or loss to:
<br />
<br />6.20.1. all employees on the Work and other persons
<br />and organizations who may be affected thereby;
<br />
<br />6.20.2. all the Work and materials and equipment to
<br />be incorporated therein, whether in storage on or off the
<br />site; and
<br />
<br />6.20.3. other property at the site or adjacent thereto,
<br />including trees, shrubs, lawns, walks, pavem{:nts, road-
<br />ways, structures, utilities and Underground Facilities not
<br />designated for removal, relocation or replacement in the
<br />course of construction.
<br />
<br />CONTRACTOR shall comply with all applicable Laws and
<br />Regulations of any public body having jurisdiction for the
<br />safety of persons or property or to protect them from damage,
<br />injury or loss; and shall erect and maintain all necessary
<br />safeguards for such safety and protection. CONTRACTOR
<br />shall notify owners of adjacent property and of Underground
<br />Facilities and utility owners when prosecution of the Work
<br />may affect them, and shall cooperate with them in the pro-
<br />tection, removal, relocation and replacement of their prop-
<br />erty. All damage, injury or loss to any property referred to
<br />in paragraph 6.20.2 or 6.20.3 caused, directly or indirectly,
<br />in whole or in part, by CONTRACTOR, any Subcontractor,
<br />Supplier or any other person or organization directly or indi-
<br />rectly employed by any of them to perform or furnish any of
<br />the Work or anyone for whose acts any of them may be liable,
<br />shall be remedied by CONTRACTOR (except damage or loss
<br />attributable to the fault of Drawings or Specifications or to
<br />the acts or omissions of OWNER or ENGINEER or anyone
<br />employed by either of them or anyone for whose acts either
<br />of them may be liable, and not attributable, directly or indi-
<br />rectly, in whole or in part, to the fault or negligence of CON-
<br />TRACTOR). CONTRACTOR's duties and responsibilities
<br />for the safety and protection of the Work shall continue until
<br />such time as all the Work is completed and ENGINEER has
<br />issued a notice to OWNER and CONTRACTOR in accord-
<br />ance with paragraph 14.13 that the Work is acceptable (except
<br />as otherwise expressly provided in connection with Substan-
<br />tial Completion).
<br />
<br />6.21. CONTRACTOR shall designate a responsible rep-
<br />resentative at the site whose duty shall be the prevention of
<br />accidents. This person shall be CONTRACTOR's superin-
<br />tendent unless otherwise designated in writing by CON-
<br />TRACTOR to OWNER.
<br />
<br />Emergencies:
<br />
<br />6,22. In emergencies affecting the safety or protection of
<br />persons or the Work or property at the site or adjacent thereto,
<br />CONTRACTOR, without special instruction or authorization
<br />from ENGINEER or OWNER, is obligated to act to prevent
<br />threatened damage, injury or loss. CONTRACTOR shall give
<br />ENGINEER prompt written notice if CONTRACTOR beiicves
<br />that any significant changes in the Work or variations from
<br />the Contract Documents have been caused thereby. If ENGI-
<br />NEER determines that a change in the Contract Documents
<br />is required because of the action taken in response to an
<br />emergency, a Work Directive Change or Change Order will
<br />be issued to document the consequences of the changes or
<br />variations,
<br />
<br />Shop Drawings and Slrmples:
<br />
<br />6.23, After checking and verifying all field measurements
<br />and after complying with applicable procedures specified in
<br />the General Requirements, CONTRACTOR shall submit to
<br />ENGINEER for revil~w and approval in accordance with the
<br />accepted schedule of Shop Drawing submissions (see para-
<br />graph 2.9), or for other appropriate action if so indicated in
<br />the Supplementary Conditions, five copies (unless otherwise
<br />specified in the General Requirements) of all Shop Drawing~,
<br />which will bear a stamp or specific written indication that
<br />CONTRACTOR has satisfied CONTRACTOR's responSl-
<br />bilities under the Contract Documents with respect to the
<br />review of the submission. All submissions will be identified
<br />as ENGINEER may require. The data shown on the Shop
<br />Drawings will be complete with respect to quantities, dimen-
<br />sions, specified performance and design criteria, materials
<br />and similar data to enable ENGINEER to review the infor-
<br />mation as required.
<br />
<br />6.24. CONTRACTOR shall also submit to ENGINEER
<br />for review and approval with such promptness as to cause
<br />no delay in Work, all samples required by the Contract Doc-
<br />uments, All samples will have been checked by and accom-
<br />panied by a specific written indication that CONTRACTOR
<br />has satisfied CONTRACTOR's responsibilities under the
<br />Contract Documents with respect to the review of the sub.
<br />mission and will be identified clearly as to material, Supplier,
<br />pertinent data such as catalog numbers and the use for which
<br />intended,
<br />
<br />6.25.1. Before submission of each Shop Drawing or
<br />sample CONTRACTOR shall have determined and ven.
<br />tied all quantities, dimensions, specified performance cri-
<br />teria. installation requirements, materials, catalog num.
<br />bers and similar data with respect thereto and reviewed
<br />or coordinated eal:h Shop Drawing or sample with other
<br />Sbop Drawings and samples and with the requirements of
<br />the Work and the Contract Documents.
<br />
<br />6.25.2. At the time of each submission, CONTRAC.
<br />TOR shall give ENGINEER specific written notice of each
<br />variation that the Shop Drawings or samples may have
<br />from the requirements of the Contract Documents, and,
<br />in addition, shall cause a specific notation to bc made on