My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06073
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD06073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:07:47 PM
Creation date
10/5/2006 1:59:00 AM
Metadata
Fields
Template:
Floodplain Documents
County
Ouray
Community
Ouray
Stream Name
Cascade Creek
Basin
Gunnison
Title
Contract Documents for Debris and Flood Control Improvements Cascade Creek, Phase II
Date
5/10/1984
Prepared For
Ouray
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />All the policies of insurance (or the certificat ,. <br />e thereot) required to be purchas . main.. <br />tained by 0 . accordance wit raphs 5.6 and <br />5.7 will contain a proVIS e ment that the coverage <br />afforded will not be can or lly chang(:d or renewal <br />refused until at irty days' prior w otice has bee'n <br />given TRACTOR by certified mail an . ~n <br />er provisions in accordance with paragraph 5.11.. II' <br /> <br />5.9. OWNER shall not be responsible for purchasing and <br />maintaining any property insurance to protect the interests <br />of CONTRACTOR, Subcontractors or others in the Work to <br />the extent of any deductible amounts that are provided in the <br />Supplementary Conditions. The risk of loss within the <br />deductible amount, will be borne by CONTRACTOR, Sub- <br />contractor or others suffering any such loss and ifany of them <br />wishes property insurance coverage within the limits of such <br />amounts, each may purchase and maintain it at the purchas.. <br />cr's own expense. <br /> <br />5.10. If CONTRACTOR requests in writing that other <br />special insurance be included in the property insurance pol- <br />icy, OWNER shall, if possible, include such insurance, and <br />the cost thereof will be charged to CONTRACTOR by appro- <br />pliate Change Order or Written Amendment. Prior to com- <br />mencement of the Work at the site, OWNER shall in writing <br />advise CONTRACTOR whether or not such other insurance <br />has been procured by OWNER. <br /> <br />Waiver of Rights: <br /> <br />5.11.1. OWNER and CONTRACTOR waive all rights <br />against each other for all losses and damages caused by <br />any of the perils covered by the policies of insurance <br />provided in response to paragraphs 5,6 and 5,7 and any <br />other property insurance applicable to the Work, and also <br />waive all such rights against the Subcontractors, ENGI- <br />NEER, ENGINEER's consultants and all other parties <br />named as insureds in such policies for losses and damages <br />so caused. As required by paragraph 6.11, each subcon- <br />tract between CONTRACTOR and a Subcontractor will <br />contain similar waiver provisions by the Subcontractor in <br />favor of OWNER, CONTRACTOR, ENGINEER, ENGI- <br />NEER's consultants and all other parties named as insureds. <br />None of the above waivers shall extend to the rights that <br />any of the insured parties may have to the proceeds of <br />insurance held by OWNER as trustee or otherwise P!lY- <br />able under any policy so issued. <br /> <br />5.11.2. OWNER and CONTRACTOR intend that any <br />policies provided in response to paragraphs 5,6 and 5,7 <br />shall protect all of the parties insured and provide primary <br />coverage for all losses and damages caused by the perils <br />covered thereby. Accordingly, all such policies shall con- <br />tain provisions to the effect that in the event of payment <br />of any loss or damage the insurer will have no rights of <br />recovery against any of the parties named as insureds or <br />additional insureds, and if the insurers require separate <br />waiver forms to be signed by ENGINEER or ENGI- <br />NEER's consultant OWNER will obtain the same, and if <br /> <br />such \vaiver forms are required of any' Subcontractor, <br />CONTRACTOR wil.! obtain the same. <br /> <br />Receipt and Application of Proceeds: <br /> <br />5.12, Any insured loss under the policies of insurance <br />required by paragraphs 5.6 and 5.7 will be adjusted With <br />OWNER and made payable to OWNER as trustee for the <br />insureds, as thl~irinterests may appear, subject to the require- <br />ments of any applicable mortgage clause and of paragraph <br />5.13. OWNER shall deposit in a separate account any money <br />so received, and shall distribute it in accordance with such <br />agreement as the parties in interest may reach. If no other <br />special agreement is reached the damaged Work shall be <br />repaired or replaced, the moneys so received applied on <br />account thereof and the Work and the cost thereof covered <br />by an appropriate Change Order or Written Amendment. <br /> <br />5.13. OWNER as trustee shall have power to adjust and <br />settle any loss with the insurers unless one of the parties in <br />intere-st shall object in writing within fifteen days after the <br />occurrence of loss to OWNER's exercise of this power. If <br />such objection be made, OWNER as trustee shall make set- <br />tlement with the insurers in accordance with such agreement <br />as the parties in interest may reach. If required in writing by <br />any party in interest, OWNER as trustee shall, upon the <br />occurn~nce of an insured loss, give bond for the proper per- <br />formam:c of sllch duties, <br /> <br />Acceptafl(:e of Insurance: <br /> <br />5.14. If OWNER has any objection to the coverage afforded <br />by or other provisions of the insurance reqt:ired to be pur~ <br />chased and maintained by CONTRACTOR in accordance <br />with paragraphs 5.3 and 5.4 on the basis of its not complying <br />with the Contract Documents, OWNER shall notify CON- <br />TRACTOR in writing lhereof \vithin ten days of the date of <br />delivery of such certificates to OWNER in accordance with <br />paragraph 2.7. If CONTRACTOR has any objection to the <br />coverage afforded by or other provisions of the policies of <br />insurancl~ required to be purchased and maintained by O\VNER <br />in accordance with paragraphs 5.6 and 5.7 on the basis of <br />their not complying with the Contract Documents, CON- <br />TRACTOR shall notify OWNER in writing thereof within ten <br />days of the date of delivery of such certificates to CON- <br />TRACTOR in accordance with paragraph 2.7. OWNER and <br />CONTRACTOR shall each provide to the other such addi- <br />tional information in r<;:spect of insurance provided by each <br />as the other may reasonably request. Failure by O\VNER or <br />CONTRACTOR to give any such notice of objection within <br />the time provided shall constitute acceptance of such insur- <br />ance purchased by the other as complying with the Contract <br />Documents. <br /> <br />Partial Utilization-Property Insurance: <br /> <br />5.15. ]f OWNER flnds it necessary to occupy or use a <br />portion or portions oflhe Work prior to Substantial Comple- <br />tion of all the Work, such use or occupancy may be accom- <br />plished in accordance with paragraph 14,10: provided that no <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.