Laserfiche WebLink
<br />Shop Drawings-All drawings, diagrams, illustrations, <br />schedules and other data which are specifically prepared by <br />or for CONTRACTOR to illustrate some portion of the Work <br />and all illustrations, brochures, standard schedules, perfor- <br />mance charts, instructions, diagrams and other information <br />prepared by a Supplier and submitted by CONTRACTOR to <br />illustrate material or equipment for some portion of the Work. <br /> <br />Specifications-Those portions of the Contract Documents <br />consisting of written technical descriptions of materi(lls. <br />equipment, construction systems, standards and workman- <br />ship as applied to the Work and certain administrative de1<lils <br />applicable thereto. <br /> <br />Subcontractor-An individual, firm or corporation having a <br />direct contract with CONTRACTOR or with any other Sub- <br />contractor for the performance of a part of the Vvork at the <br />site. <br /> <br />Substantial Completion-The Work (or a specified part there-ot) <br />has progressed to the point where, in the opinion of ENOl. <br />NEER as evidenced by ENGINEER's definitive certificate <br />of Substantial Completion, it is sufficiently complete, in <br />accordance with the Contract Documents, so that the Work <br />(or specified part) can be utilized for the purposes for which <br />it is intended; or if there be no such certificate issued, when <br />final payment is due in accordance with paragraph 14.13. The <br />terms "substantially complete" and "substantially com. <br />pleted" as applied to any Work refer to Substantial CompJe. <br />tion thereof. <br /> <br />Supplernenrary Conditions-The part of the Contract Docu- <br />ments which amends or supplements these General Condi- <br />tions. <br /> <br />Supplier-A manufacturer, fabricator, supplit::r, distributor, <br />materialman or vendor. <br /> <br />Underground Facilities-All pipelines, conduits, ducts, cables, <br />wires, manholes, vaults, tanks, tunnels orother such facHides <br />or attachments, and any encasements containing such facil- <br />ities which have been installed underground to furnish any of <br />the following services or materials: electricity, gases, steam, <br />liquid petroleum products, telephone or other communica- <br />tions, cable television, sewage and drainage removal, tramc <br />or other control systems or water. <br /> <br />Unit Price Work-Work to be paid for on the basis of unit <br />prices. <br /> <br />Work-The entire completed construction orthe various sep- <br />arately identifiable parts thereof required to be furnished <br />under the Contract Documents. Work is the result of per- <br />forming services, furnishing labor and furnishing and incor- <br />porating materials and equipment into the construction. all <br />as required by the Contract Documents. <br /> <br />Work Directive Change-A written directive to CONTRAC- <br />TOR. issued on or after the Effective Date of the Agreement <br />and signcd by OWNER and recommended by ENGINEER, <br /> <br />ordering an addition. deletion or revision in the Work, or <br />responding to differing or unforeseen physical conditions under <br />which the Work is to be performed as provided in paragraph <br />4.2 or 4.3 or to emergencies under paragraph 6.22. A Work <br />Dire:'~tive Change may not change the Contract Price or the <br />Contract Time, but is evidence that the parties expect that <br />the change directed or documented by a Work Directive <br />Change will be incorporated in a subsequently issued Change <br />Order following negotiations by the parties as to its effect. if <br />any, on the Contract Price or Contract Time as provided in <br />paragraph 10.2. <br /> <br />Written A.mendment--A written amendment of the Contract <br />Documents, signed by OWNER and CONTRACTOR on or <br />after tbe Effective Date oftht:~ Agreement and normally deal- <br />ing with the nonengincering or nontechnical rather than strictly <br />Work-related aspects of the Contract Documents. <br /> <br />ARTICLE 2-PREUMINARY MATTERS <br /> <br />Delil1ery of Bonds: <br /> <br />2.1. When CONTRACTOR delivers the executed Agree- <br />ment" to OWNER, CONTRACTOR shall also deliver to <br />OWNER such Bonds as CONTRACTOR may be required to <br />furnish in accordance: with paragraph 5. I. <br /> <br />Copi,ps of Documents: <br /> <br />2.2. OWNER shall furnish to CONTRACTOR up to ten <br />copies (unless otherwise specified in the Supplementary Con- <br />ditions) of the Contract Documents as are reasonably nec- <br />essary for the execution of the Work. Additional copies will <br />be fumi<>hed, upon request, at the cost of reproduction. <br /> <br />Commencement of Contract Time; Notice to Proceed: <br /> <br />2.3. The Contract Time will commence to run on the <br />thirtieth day after the Effective Date of the Agreement. or. if <br />a Notice to Proce~:d is given, on the day indicated in the <br />Notil;:-e to Proceed. A Notice to Proceed may be given at any <br />time within thirty days after the Effective Date of the Agree- <br />ment. In no event wiH the Contract Time commence to run <br />later than the seventy-fifth day after the day of Bid opening <br />orthle thirtieth day after the Effective Date of the Agreement. <br />whichever date is earl ier. <br /> <br />Starting the Project: <br /> <br />2.4. CONTRACTOR shall start to perform the Work on <br />tbe date when the Contract Time commences to run. but no <br />Work shall be done at the site prior 10 the date on which the <br />Contract Time comml~nces to run. <br /> <br />Before Starting Comttruction: <br /> <br />2.5. Before undertaking each part of the Work, CON- <br />TRACTOR shall carefully study and compare thc Contract <br />Documents and check and verify pertinent figures shown <br /> <br />8 <br />