Laserfiche WebLink
<br />5.1. Progress Payments. OWNER shall make progress payment:~ on account of the Contract Price on the basis of COI\4 <br />TRACTOR's Applications for Payment as recommended by ENGINEER, on or about the. . . . . . . .LOth. . . . day of each <br />month during construction as provided below. All progress payments. will be on the ba:;is of the progress of the Work measured <br />by the schedule of values provided for in paragraph 14. I of the General Conditions. <br /> <br />5.1.1. Prior to Substantial Completion progress payments ~\'ill be;n an amount equal to: <br /> <br />9Q . . .. % of the Work completed, and <br /> <br />90 <br />. . . . . . . . . . .. % of materials and equipment not incorporated in the Work but delivered and suitably stored. <br />less in each case the aggregate of payments previously made. <br /> <br />5. I .2. Upon Substantial Completion, OWNER shall pay an amount sufficient to increase total payments to CON~ <br />TRACTOR to . . . . . ~:~ . . . . " % of the Contract Price, less such amounts as ENGINEER shall determine in accordance <br />with paragraph 14.7 of the General Conditions. <br /> <br />5.2. Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph 14.13 of the <br />General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in <br />said paragraph 14.13. <br /> <br />Article 6. INTEREST. <br /> <br />All moneys not paid when due hereunder shall bear interest at the maximum rate allowed by law at the place of the Project. <br /> <br />Article 7. CONTRACTOR'S REPRESENTATIONS. <br /> <br />In order to induce OWNER to enter into this Agreement CONTRACTOR makes 1.h,: following. representations: <br /> <br />7.1. CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, locality, and <br />with all local conditions and federal, state and local laws, ordinances, rules and regulations that in any manner may affect <br />cost, progress or performance of the Work. <br /> <br />7.2. CONTRACTOR has studied carefully all reports of investigations a.nd tests of subsurface and latent physical condi- <br />tions at the site or otherwise affecting cost, progress or performance of the Work which were relied upon by ENGINEER in the <br />preparation of the Drawings and Specifications and which have been identified in th,: Supplementary Conditions. <br /> <br />7.3. CONTRACTOR has made or caused to be made examinat.ions, investigations and tests and studies of such reports <br />and related data in addition to those referred to in paragraph 7.2 as h,: deems necessary for the performance of the Work at the <br />Contract Price, within the Contract Time and in accordance with the olher terms and ,:onditions of the Contract Documents; <br />and no additional examinations, investigations, tests, reports or similar data are or will be required by CONTRACTOR for <br />such purposes. . <br /> <br />7.4. CONTRACTOR has correlated the results of all sU\:h observations, examinations, investigations, tests, reports and <br />data with the terms and conditions of the Contract Do<;uments. <br /> <br />7.5. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered <br />in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br /> <br />7.6. Not Used. <br /> <br />Article 8. CONTRACT DOCUMENTS. <br /> <br />The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR are attached to this <br />Agreement, made a part hereof and consists of the following: <br /> <br />8.1. This Agreement (pages 1 to ...., inclusive). <br /> <br />8.2. Exhibits to this Agreement (pages. . . ~ to . . . ., inclusive). <br /> <br />8.3. Performance and other Bonds, identified as exhibits <br /> <br />and consisting of . <br /> <br />pages. <br /> <br />8.4. Notice of Award. <br /> <br />8.5. General Conditions (pages.. . . to <br /> <br />. inclmive). <br /> <br />8.6. Supplementary Conditions (pages <br /> <br />to . . . ., inclusive). <br /> <br />Page 2 of <br /> <br />pages <br />