<br />1. Defined Terms. <br />Terms used in these Instructions to Bidders which are defined <br />in the Standard General Conditions of the Conslruction Con- <br />tract, NSPE.ACEC Document 1910.8, CSI 56465 (19711 edi. <br />tions) have the meanings assigned to them in the General Con- <br />ditions. The term "Successful Bidder" means thl~ lowest, <br />qualified. responsible Bidder to whom Owner (on the basis of <br />O~"-ner's evaluation as hereinafter provided) makes an award, <br /> <br />2. Copies of Bidding Documents. <br /> <br />2.1. Complete sets of the Bidding Documents in the num- <br />ber and for the deposit sum, if any, stated in Ihe Advertise- <br />ment or Invitation may be obtained from Engineer (u nless <br />another issuing office is designated in the Advertisement or <br />Invitation to Bid). <br /> <br />2.2. Complete sets of Bidding Documents shall be llsed in <br />pl'epar;, g Bids; neither Owner nor Engineer assume any re- <br />sponsibility for errors or misinterpretations resulting from <br />the use of incomplete sets of Bidding Documents. <br /> <br />2.3. Owner and Engineer in making copies of Bidding <br />Documents available on the above terms do so only for thc <br />purpose of obtaining Bids on the Work and do not coder a <br />license or grant for any other use. <br /> <br />3. Qualifications of Bidders. <br />To demonstrate qualifications to perform the Work, each <br />Bidder must be prepared to submit within five days of Own- <br />er's request written evidence of the types set forth in the Sup- <br />plementary Conditions, such as financial data, previous expe- <br />rience and evidence of authority to conduct business in the <br />jurisdiction where the Project is located. Each Bid must con- <br />tain evidence of Bidder's qualification to do business in the <br />state where the Project is located or covenant to obtain such <br />qualification prior to award of the contract. <br /> <br />4. Examination of Contract Documents and Site. <br /> <br />4.1. Before submitting a Bid, each Bidder must (a) exam- <br />ine the Contract Documents thoroughly, (b) visit the site to <br />familiarize himself with local conditions that may in any <br />manner affect cost, progress or performance of the Work, <br />(c) familiarize himself with federal, state and local laws, <br />ordinances, rules and regulations that may in any manner <br />affect cost, progress or performance of the Work; and (d) <br />study and carefully correlate Bidder's observations with the <br />Contract Documents. <br /> <br />4.2. Reference is made to the Supplementary Conditions <br />for the identification of those reports of investigatiom and <br />tests of subsurface and latent physical conditions at the site <br />or otherwise affecting cost, progress or performance of the <br />\Vork which have been relied upon by Engineer in preparing <br />the Drawings and Specifications. Owner will make copies of <br />such reports available to any Bidder requesting them. These <br />reports arc not guaranteed as to accuracy or completeness, <br />nor are they part of the Contract Documents. Before sub- <br />mitting his Bid each Bidder will, at his own expense, make <br />sueh additional investigations and tests as the Bidder may <br />deem necessary to determine his Bid for performance of the <br />\\lork in accordance with the time, price and orher terms and <br />conditions of the Contract Documents. <br /> <br />4..1. Ch request Owner wiU provide each Bidder acees) 1O <br />the site to conduct such: nvestigations and tests as each Bid- <br />der deems nece:;sary for ~,ubmi<;siotl of his Bid. <br />4.4. The lands upon which the Work is to be ncrforrncd, <br />rights-cli'-way' for access thereto and other lands de<,ignated <br />for use by Contractor in performing the Work arc identified <br />in the Supplementary Conditions, General Requirements or <br />Drawings. <br />,L5. The subrnis<;ion of a Bid will constitute an incontro. <br />vcrtible representafion by the Bidder that he has complied <br />with every requirement of thi" Article 4 and that the <br />Contracl Documents arc sufficient in scope and detail to <br />indicate and convey understanding of all term" and condi- <br />tions for performance of the Work. <br />5. Interprchllions. <br />All questions about the meaning or intent of the Contract <br />DocumenTs shall be submitted to Engineer in \\iTiting. Replie~ <br />will be is~;ucd by Addenda mailed or delivered to all parties r('- <br />corded by Engineer as having received the Bidding Docu- <br />ments. Questions received less than ten days prior to the dale <br />for opening of Bids will not be am-wered. Only questions an- <br />swered by formal written Addenda \....ill be binding. Oral and <br />other interpretations or clarifications wi!! be \\ithout legal <br />effect. <br /> <br />6. Bid St'curit)'. <br />6.1. Bid Security shall be made payable to Owner. in an <br />amount of five percent of the Bidder'<; maximum Bid price <br />and in the form of a ceflified or bank check or a Bid Bond <br />(on form attached. if a form is prescribed) issucd by a Surety <br />meeting the requirements of paragraph 5.] of the Genera] <br />Conditions. <br /> <br />6.2 nil: Bid Security of the SUi..:ccssful Bidder will be rc- <br />tained until such Bidder has executed the Agreement and <br />furnished the H:'quired Contract Security. whereupon it \\ill <br />be returned; if the successful Bidder fail~ to exccu!e and de- <br />li\"Cr th{' Agreement and I.urnish tlH' required Contract Sccu. <br />rity within [5 days of the Notice of Award. Owner Illay an- <br />nul the i'Joticc of Award and the Bid Security of that Bidder <br />\vill be forfeited. The Bid Security of any Bidder \\hom <br />OWller believes to have a reasonable chancc of receiving Ihc <br />award may be retained by Owner until the earlier of the SC\. <br />enth day after the "effec1:ive date of the Agreement" (which <br />lerm is <kfinec1 in the General Condition:,) by Owner to C~lll- <br />lrat:tor and the required Contract Security is furnished or <br />the )ixt~--fir<;t day after the Bid opening. Bid Security of <br />other Biddfl"~ will be returned within Se\TIl day~ of the Bid <br />opening. <br /> <br />7. Contract Timt~. <br /> <br />The numb,:::r of da\'s within which. or the date by which, {he <br />Work is to be completed (the Contract Time) is ')et forth in the <br />Bid Form and wii! be included in the Agreement. <br /> <br />8. Liquidated Damages. <br /> <br />Provisions for liquidated damages, if any, are St;t forth in lhe <br />Agreemenl. <br /> <br />9. Substitute Matl'rial and Equipment. <br /> <br />The Contract, if awarded, will be on the basis of material and <br />equipment described in the Drawings or specified in the Speci- <br />fications '".ithout consideration of possible substitute or "or- <br />equal" items. \\'henever it is indicated in the Drawings or <br /> <br />-2-- <br />