My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06026
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD06026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:07:38 PM
Creation date
10/5/2006 1:56:56 AM
Metadata
Fields
Template:
Floodplain Documents
County
Ouray
Community
Ouray
Stream Name
Uncompahgre River
Basin
Gunnison
Title
North Ouray Uncompahgre River Redevelopment Project
Date
11/1/1993
Prepared For
Ouray
Prepared By
William Ruzzo
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />William P. Ruzzo, P.E. <br />10652-D West Florida Avenue <br />Lakewood, CO 80232 <br />(303 )985-091 <br /> <br />November I, 1993 <br /> <br />Mr. Larry Lang <br />Colorado Water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver, CO 80203 <br /> <br />Mr. David Vince, City Administrator <br />City of Ouray <br />P.O. Box 468 <br />Ouray, CO 81427 <br /> <br />Re: North Ouray Uncompahgre River Redevelopment Project <br /> <br />Dear Larry: <br /> <br />Enclosed is the report North Ouray Uncompahgre River Redevelopment Project prepared for <br />the Colorado Water Conservation Board and the City of Ouray. The report addresses two issues: <br /> <br />I. Development of the base line HEC-2 model for the 100-year flood, and; <br /> <br />2. Evaluation of proposed channelization between stations 659+00 and 700+00, <br /> <br />The development of the HEC-2 model was necessary because the original model for the <br />Uncompahgre River developed by A&S Consultants was not available. The proposed channeliza- <br />tion, which includes a fishing pond and a sediment/debris pond, will remove much of the valley <br />floor from the floodplain, thereby improving existing flooding conditions and allowing for other <br />land uses. <br /> <br />The report presents the approaches used to develop the hydraulic model and to size the proposed <br />facilities. Included in the various appendices are the HEC- 2 models, cross sections and <br />calculations. Also inclosed is a diskette with the two final HEC-2 models, one for the baseline <br />condition and one for the proposed channelization project. <br /> <br />Thank you for the opportunity to be of service. <br /> <br />Respectfully, <br /> <br /> <br />William P. Ruzzo, P.E. <br /> <br />encl: report <br />5-1/4" diskette <br />
The URL can be used to link to this page
Your browser does not support the video tag.