Laserfiche WebLink
<br />3 <br /> <br />of 1968, as amended, communities participating in the NFIP are required to adopt and enforce floodplain <br />management regulations that meet or exceed minimum NFIP criteria. These criteria are the minimum and <br />do not supersede any State or local requirements of a more stringent nature. This includes adoption of the <br />effective FIRM to which the regulations apply and the modifications described in this LOMR. Our records <br />show that your community has met this requirement. <br /> <br />A Consultation Coordination Officer (CCO) has been designated to assist your community. The CCO will <br />be the primary liaison between your community and FEMA. For information regarding your CCO, please <br />contact: <br /> <br />Mr. Steve L. Olsen <br />Director, Mitigation Division <br />Federal Emergency Management Agency, Region VIII <br />Denver Federal Center, Building 710, Box 25267 <br />Denver, Colorado 80225-0267 <br />(303) 235-4830 <br /> <br />If you have any questions regarding floodplain management regulations for your community or the NFIP <br />in general, please contact the CCO for your community at the telephone number cited above. If you have <br />any technical questions regarding this LOMR, please contact Mr. Mike Grimm of our staff in Washington, <br />DC, either by telephone at (202) 646-2878 or by facsimile at (202) 646-4596. <br /> <br />Sincerely, <br /> <br />~I <br />" 'v;~,~~ <br /> <br />..-;; Matthew B. Miller, P.E., Chief <br />"T~ <br />Hazards Study Branch <br />Mitigation Directorate <br /> <br />Enclosure(s) <br /> <br />cc: The Honorable Michael J. Tanner <br />Mayor, Town of Columbine Valley <br /> <br />The Honorable Pat Cronenberger <br />Mayor, City of Littleton <br /> <br />Ms. Cindy Love <br />Love & Associates, Inc. <br /> <br />Mr. Robert Christensen, P.E. <br />Project Engineer <br />P. R. Fletcher & Associates, Inc. <br />