My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06000
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD06000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:11:57 AM
Creation date
10/5/2006 1:56:04 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Adams
Community
Aurora, Arapahoe County
Stream Name
First Creek
Basin
South Platte
Title
Major Drainageway Planning
Date
3/1/1977
Prepared For
Arapahoe County
Prepared By
Engineering Consultants
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~TH[~Cj,~-;~rb ENO-INJI::BJRINO- CONI3 r..:r:L'TAN l.''''_~ '!- <br /> <br />Mr. L. Scott. Tucker <br />DG 418/77 <br />Marc> 31, 1977 <br />Page Two <br /> <br />fE_~_~i.~!~E:~l"Y _ !2!~~~tg r:t~ <br /> <br />Preliminary designs for the First. (:reek have been prepared in ac- <br />cord,3.nce with the decision reached in disclJssions with the -Urban Drain-- <br />age ,nd Flood Control District. <br /> <br />Improved channel sections ",ere clf's:gnd fo:: the 100.'year flows with <br />adeq-late riprllp protection provided whe]~ever necessary. The ma~orj_ty of <br />the :?irst Creek channel and the entire ~ribJtar~l T channel_ has beerl <br />recolmnended for Flood Plain Zoning only. <br /> <br />The general criteria for designing stc-Jctu,"es crossing First C:reelt <br />was to pass the 10-year flows with structural protection against. the 100- <br />year flows. Waterway for major crossing were d~~signed to pass the 100- <br />year flows under pressure flow conditi,oTLs ~itho\lt overtopping the road- <br />way. The Fir:;t Creek has been channelizf~d in c!~rtain reaches to pass <br />the lOO-year flow. <br /> <br />Cost Estimat~es <br />----- -~- - ---- <br /> <br />Construction costs fo_r the proj cc t havl= been computed. The total <br />cons.cruction cost is estimated to be $2,290,000 (February, 197:' prices). <br />This includes 20 percent for continger_cj.es ,Inri ~In additiona-L 8 percent <br />Eor l~ngineeriIlg, legal and administrativf~ t{~es. <br /> <br />The over~lll estimated project cost pYl~:;entE~d ill this report is <br />higher than the estimate given in the Phase_ A rE'port due to changes tn <br />improvements proposed under Plan A. This I.llcrease is also due t,o the <br />designs having been further modified from I,_hose llsed in the Phase p, <br />repol~t and higher construction unit cost.~; u:;ed, <br /> <br />A table of average annual cos.ts of Lhc "Continuation of Existing <br />Cond:~tions!l plan and recommended plan i~:, a1:;0 prl'sented in Table IV-Lf to <br />read:~ly allow a comparison of the benefits 'ivhich can be derived hy im- <br />plementing the proposed scheme. <br /> <br />Conc Ius i or:. <br />~----- - <br /> <br />The work performed under Phase B conf-i,nns ::>ur conclusion of the <br />Phase A report. that the improvements t:) the First Creek drainageway are <br />economical in reducing flood damage ill the First: Creek. <br />
The URL can be used to link to this page
Your browser does not support the video tag.