Laserfiche WebLink
<br />CHAPTER III <br /> <br />MASTER PLAN DRAwINGS <br />~~_._,~-~-_._._--,----_.,.._-- <br /> <br />Introduct.ion <br />~---_.-----~--_. <br /> <br />All drawings referred to in this re"Jort are presented in Volume II. <br /> <br />The base maps for drawings numbered 1 through L~ are taken from the Phase <br /> <br /> <br />A report. They depict the drawings list., location of the First Creek <br /> <br /> <br />basin, index maps, plan and profile legelld, and basin and sub-basil) <br /> <br />boundaries. <br /> <br />Drawings 5 through 8 show the lOO-year design hydrographs. These <br /> <br /> <br />hydr'graphs represent flows at selected design points within the drain- <br /> <br /> <br />age basin. The peak flows from these hydrographs were presented in <br /> <br />Tabl e II -4. <br /> <br />Drawings 9 through 32 present the docainage"ay planning for First <br /> <br />Creek in the form of plan and profile sheets. These drawings show the <br /> <br /> <br />proposed drainageway improvements and the future 100-year flood plain <br /> <br /> <br />corr',sponding to the improved drainageway. Also, the future lOCi-year <br /> <br /> <br />floolj plain corresponding to the exist.inl~ drainageway conditions is pre- <br /> <br /> <br />sentl~d for reaches where structural improvements are not recommendf~d, <br /> <br />The major drainageway plannj,ng drawl.ngs COIltain sufficient detail <br /> <br /> <br />III both plan and profi le for planning purpo:3es. Therefore, the fol low.. <br /> <br /> <br />ing discussion will not contain any speci fics foy individual improve" <br /> <br /> <br />ffientl;. Also, throughout this chapter, t.he ":erminology flood plain zoo., <br /> <br /> <br />lug ::or a specific reach is intended to mean: <br /> <br />1. As soon as it is practically possible, the area within <br /> <br /> <br />the 100-year flood plain for fut.ure basin development and existing <br /> <br /> <br />drainageway conditions should be desigTled as Flood Plain Zone. <br /> <br />2. At such time in the future, \vhen the drainageway improve- <br /> <br /> <br />ments suggested in this report are imp_emented, the Flood Plain <br /> <br />zoned areas as in 1 above should be moclificd to cover areas under <br /> <br />the future 100-year flood with imprcv~d dr.inage"ay conditions. <br /> <br />TIT-I <br />